Laserfiche WebLink
xK sv' ,� ••'a«:y a <br /> Quik Stop Market No, 132 August 28, 1990 <br /> Job No. 349132-31 Page 4 <br /> The geologist will prepare a log of the subsurface conditions encountered during <br /> drilling and will classify the soils according to the Unified Soil Classification System <br /> and Munsell Soil Color Charts. All drilling logs will be reviewed by a certified <br /> engineering geologist, <br /> Groundwater Monitoring Well Construction <br /> After the soil sampling is completed, Exceltech will install a groundwater monitoring <br /> wells in each designated exploratory boring. Exceltech will construct the monitoring <br /> wells in accordance with all permit requirements of San Joaquin County. <br /> The wells will be constructed of 2-inch•diameter, Schedule 40, flush-threaded polyvinyl <br /> chloride (PVC) blank and slotted casing; no glues or solvents will be used. After <br /> drilling the boring to the desired depth, the PVC casing will be installed through the <br /> hollow-stem auger. The screened interval of the casing will extend sufficiently above <br /> the water table so that the presence of free floating product can investigated. As the <br /> auger is withdrawn, sand will be slowly poured down the borehole annulus to <br /> approximately 2 feet above the slotted screen section. Bentonite pellets will be placed <br /> on top of the sand and hydrated to form an annular seal. The remaining portion of the <br /> annular space will be sealed with a neat cement and bentonite grout. The top of the well <br /> will be set in a waterproof traffic-rated vault box slightly above grade with a locking <br /> cover to provide security and protect the PVC wellhead. A concrete surface seal will <br /> u <br /> be installed to complete the well construction. <br /> Survey <br /> f <br /> The wells will be surveyed by a licensed land surveyor, 'Me wells will be located both <br /> horizontally and vertically (to the nearest .01 feet MSL). A site plan will be prepared <br /> at a reasonable scale so that the data can be portrayed in a uwful manner. <br /> Well Development <br /> After construction,each well will be developed using a surge block to agitate and set the <br /> rs sand pack around the annulus of the well casing. A baiter will be used to remove water <br /> manually after each surge. Well development (a) removes residual silts and clays left <br /> from the drilling and (b) improves the hydraulic Conductivity between the wells and the <br /> natural formation, After development, the well will be allowed to recharge with water <br /> from the surrounding formation (approximately 24 hours), enabling Exceltech to <br /> collect a representative water sample and to, measure the thickness of any floating <br /> praduct encountered <br /> All water collected during well developnmont will be placed in DOT 17E drums and Ieft <br /> z <br /> on-site until laboratory analyses are complete. At that time, the drums and water may <br /> be properly disposed of by Quik Stop. <br /> t' <br /> J5fHD31333X3 LL:00 061 U� 5nU <br />