Laserfiche WebLink
�. . E <br /> V <br /> Quik Stop Market No. 132 August 14, 1990 <br /> Job No. 349132-31 Page 3 <br /> r- <br /> hollow-stem auger. The screened interval of the casing will extend sufficiently above <br /> the water table so that the presence of free floating product can investigated. As the <br /> auger is withdrawn, sand will be slowly poured down the borehole annulus to <br /> approximately 2 feet above the slotted screen section. Bentonite pellets will be placed <br /> on top of the sand and hydrated to form an annular seal. The remaining portion of the <br /> annular space will be sealed with a neat cement and bentonite grout. The top of the well <br /> will be set in a waterproof traffic-rated vault box slightly above grade with a locking <br /> cover to provide security and protect the PVC wellhead. A concrete surface seal will <br /> be installed to complete the well construction. <br /> Well Development <br /> After construction, the well will be developed using a surge block to agitate and set the <br /> } sand pack around the annulus of the well casing. A bailer will be used to remove water <br /> manually after each surge. Well development (a) removes residual silts and clays left <br /> from the drilling and (b) improves the hydraulic conductivity between the wells and the <br /> natural formation. After development, the well will be allowed to recharge with water <br /> from the surrounding formation (approximately 72 hours), enabling Exceltech to <br /> collect a representative water sample and to measure the thickness of any floating <br /> f product encountered. <br /> All water collected during well development will be placed in DOT 17E drums and left <br /> (7. on-site until laboratory analyses are complete. At that time, the d.ums and water may <br /> be properly disposed of by the client. <br /> Groundwater Sampling <br /> Before sampling groundwater, an Exceltech geologist will field-check the monitoring <br /> wells with an interface probe or a clear acrylic bailer to check for the presence of free- <br /> floating product: In monitoring wells where no floating product is observed, each well <br /> will be purged of a minimum of 4 well casing volumes of groundwater before <br /> sampling. Purged water will be placed in DOT 17E drums. All important well <br /> s sampling information will be included in the final report. The information will include <br /> u pH, temperature, conductivity,and water volume removed. <br /> a <br /> Samples will then be collected with a clean Teflon bailer and transferred to <br /> - appropriate laboratory-supplied bottles. The samples will be analyzed for total <br /> petroleum hydrocarbons as gasoline (TPHG); benzene, toluene, ethyl benzene, and <br /> xylenes @TE7C�; total lead; and organic lead. Each bottle will be labeled and logged on <br /> _ a chain-of-custody._.form and placed in a cooler containing ice for transport to a <br /> California-certified.laboratory. Appendix A includes the Exceltech Groundwater------- <br /> Sampling Protocols.. <br /> k <br /> i ` <br />