My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012711
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:21:26 PM
Creation date
1/31/2020 11:25:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012711
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y Y <br /> Ism- 'El��4�ili�'��!!,!,,������l�',����i:��� <br /> Milli i, <br /> r - - <br /> August 14, 1990 <br /> Quik Stop Market No. 132 Page 4 <br /> Joh No. 349132-31 <br /> REPORT <br /> Exceltech will prepare a site investigation report presenting ,he findings of the <br /> investigation. The report will include: <br /> • Field procedures for exploratory borings- <br /> 0 Results of analytical testing. <br /> . A site map showing Ecefeatures relevant to the investigation. <br /> • Boring loWce <br /> gs for each exploratory boring drilled by <br /> • Construction details of the groundwater monitoring applicable <br /> } <br /> • Concentration contour maps of soil contamination,if app <br /> ' Interpretation of data. <br /> • Recommendations. <br /> SCHEDULF, <br /> ltech is prepared to perform the proposed scope of work once approval is received <br /> i Exce In <br /> s from the San Joaquin County Health District. We have scheduled the drilling for <br /> t August lb, 1990. The Filling and well development;is expected to take l to 2 days. <br /> The singling of the Nell will take place approximately 3 days following development. <br /> Laboratory results will be available approyin;ately 2 days following submittal: A final <br /> Ilkwritten report will be prepared approximately 1 to 2 weeks following receipt of the <br /> laboratory results. <br /> } �0 <br /> r <br /> 011;019 01jBIFIRM Jim <br /> t <br /> 4, <br /> .a <br /> r <br /> n <br /> a—w <br /> y <br />
The URL can be used to link to this page
Your browser does not support the video tag.