Laserfiche WebLink
Y Y <br /> Ism- 'El��4�ili�'��!!,!,,������l�',����i:��� <br /> Milli i, <br /> r - - <br /> August 14, 1990 <br /> Quik Stop Market No. 132 Page 4 <br /> Joh No. 349132-31 <br /> REPORT <br /> Exceltech will prepare a site investigation report presenting ,he findings of the <br /> investigation. The report will include: <br /> • Field procedures for exploratory borings- <br /> 0 Results of analytical testing. <br /> . A site map showing Ecefeatures relevant to the investigation. <br /> • Boring loWce <br /> gs for each exploratory boring drilled by <br /> • Construction details of the groundwater monitoring applicable <br /> } <br /> • Concentration contour maps of soil contamination,if app <br /> ' Interpretation of data. <br /> • Recommendations. <br /> SCHEDULF, <br /> ltech is prepared to perform the proposed scope of work once approval is received <br /> i Exce In <br /> s from the San Joaquin County Health District. We have scheduled the drilling for <br /> t August lb, 1990. The Filling and well development;is expected to take l to 2 days. <br /> The singling of the Nell will take place approximately 3 days following development. <br /> Laboratory results will be available approyin;ately 2 days following submittal: A final <br /> Ilkwritten report will be prepared approximately 1 to 2 weeks following receipt of the <br /> laboratory results. <br /> } �0 <br /> r <br /> 011;019 01jBIFIRM Jim <br /> t <br /> 4, <br /> .a <br /> r <br /> n <br /> a—w <br /> y <br />