My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012711
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:21:26 PM
Creation date
1/31/2020 11:25:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012711
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHS-mi <br /> - e-� i � ➢�. ._. ....tea - - ry - - - <br /> "all <br /> 1 <br /> Quik Stop Markets August 14, 1990 <br /> Project No. 349132-41 Page 1 <br /> PR®.TECI' SAFEIV PLAN <br /> FOR <br /> QUIK STOP MARKETS #132 <br /> 3555 W HAMMER LANE <br /> STOCKTON, CALIFORNIA <br /> I. INTRODUCTION <br /> a <br /> This revised Project Safety Plan delineates the basic safety requirements for the <br /> emergency response, soil excavation,and geological investigation for the facility located <br /> at 3555 W Hammer Lane, Stockton, County of Sacramento, California. <br /> 4' <br /> ' The site is a service station and convience store facility. The underground storage tanks <br /> on the premises contained , gasoline, and diesel#fuel:'Exceltech Inc.'s work will include <br /> excavation of contaminated soil, possible remediation of the soil, backfilling the <br /> excavation,and geological investigation. <br /> a <br /> z To provido for site security, the site will be blocked off for the duration of thero'ect <br /> This will be.accomplished through the use of a 3-foot high baracde (on the Hammer and <br /> at Mariners Street sides). Signs which read "Construction Zone--Authorized Personnel <br /> Only" will be attached to the baracades. In addition, barricades with reflective tape and <br /> battery-operated.flashers will be used around the inside. <br /> The provisions set forth in this;plan will apply to the employees of Exceltech, Inc. and <br /> its subcontractors working on the project. The subcontractors may elect to modify <br /> v ; these provisions; but only to upgrade or increase the safety requirements,and only with <br /> the concurrence of Exceltech, Inc.as designated and accepted in writing. <br /> t - <br /> This Project Safety Plan addresses the expected potential hazards that may be <br /> encountered during this project. field activities will begin on iu1y:31, 1990 and are <br /> expected to continue for approximately 3 weeks from the start date: If changes in:site <br /> ' or working conditions occur as the activities progress, amendments to this plan will be <br /> J� provided by Exceltech,Inc. <br /> 2. PROJECT SAFETY AUTHORITY. <br /> Personnel responsible for the project safety are: Eric Kieselbach, Corporate Safety <br /> ? 3 <br /> Officer; Jim Jordan, Fremont Office Safety Coordinator; Randy Stone,.Project <br /> { Manager; Torn Hicks, Project Supervisor; Tom Hicks, Project Foreman; and John <br /> Monroe,Project Geologist. <br /> 4, � <br /> IBM I <br />
The URL can be used to link to this page
Your browser does not support the video tag.