Laserfiche WebLink
{ <br /> Quik Stop Markets <br /> Project No. 349132-41 August 14, 1990 <br /> Page 2 <br /> The Fremont Office Safety Coordinator and the <br /> anager are responsible for <br /> reviewing and authorizing the provisions of this Plan(as tdesignated by their signatures <br /> on each page of this Plan). <br /> The Project Supervisor is responsible for the submittal of this plan tt, the Project <br /> Foreman and for advising the Project Foreman on health and safety matters. He has the <br /> authority to provide for the auditing of compliance with the provisions of this plan, <br /> suspend or modify work practices, and to administer disciplinary acticns for individuals <br /> whose conduct does not meet the requirements set forth herein. The Project Supervisor <br /> will ensure that the following items are adequately addressed: <br /> t • Safety Supplies and Eq,iipraent Inventory <br /> • Medical Surveillance Program/Physical Examinations <br /> • Training Programs/Hazard Communication <br /> Accident/Incident Reporting Procedures <br /> • Decontamination/Contamination Reduction Procedures <br /> The Project Foreman and the Project Geologist are responsible for thedissemination of <br /> the information contained in this plan to site personnel and to the responsible <br /> representative of each subcontracting firm working tinder ExceItec11, Inc, on the <br /> project. <br /> The Project Foreman will act as the Site Safety Officer. During the geological <br /> investigation when the Project Foreman is not present, the Project Geologist will <br /> the Site Safety Officer. The Site Safety Officer is responsible for ensact as <br /> uring that the <br /> following items are adequately addressed: <br /> w� <br /> Ensure that all personnel on-site adhere to the requirements of the project <br /> safety plan. <br /> • Obtain acknowledgement, on signoff page enclosed as Attachment A, from all <br /> on-site. personnel or visitors regarding their acceptance of the project safety <br /> E i <br /> Plan requirements. <br /> • Investigate all incidents and accidents and report in writing to the Project <br /> Supervisor who will report to the Corporate Safety Officer. <br /> • Ensure that Proper <br /> personal decontamination points are available. <br /> The Project Supervisor and the Site Safety Officer have the authority to suspend work <br /> x anytime they determine that the provisions of the plan are inadequate to ensure worker <br /> safety. The Site Safety Officer shall also inform the Project Supervisor of individuals <br /> whose conduct is not consistent with the requirements of the plan. <br />