My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012711
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:21:26 PM
Creation date
1/31/2020 11:25:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012711
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> Quik Stop Markets <br /> Project No. 349132-41 August 14, 1990 <br /> Page 2 <br /> The Fremont Office Safety Coordinator and the <br /> anager are responsible for <br /> reviewing and authorizing the provisions of this Plan(as tdesignated by their signatures <br /> on each page of this Plan). <br /> The Project Supervisor is responsible for the submittal of this plan tt, the Project <br /> Foreman and for advising the Project Foreman on health and safety matters. He has the <br /> authority to provide for the auditing of compliance with the provisions of this plan, <br /> suspend or modify work practices, and to administer disciplinary acticns for individuals <br /> whose conduct does not meet the requirements set forth herein. The Project Supervisor <br /> will ensure that the following items are adequately addressed: <br /> t • Safety Supplies and Eq,iipraent Inventory <br /> • Medical Surveillance Program/Physical Examinations <br /> • Training Programs/Hazard Communication <br /> Accident/Incident Reporting Procedures <br /> • Decontamination/Contamination Reduction Procedures <br /> The Project Foreman and the Project Geologist are responsible for thedissemination of <br /> the information contained in this plan to site personnel and to the responsible <br /> representative of each subcontracting firm working tinder ExceItec11, Inc, on the <br /> project. <br /> The Project Foreman will act as the Site Safety Officer. During the geological <br /> investigation when the Project Foreman is not present, the Project Geologist will <br /> the Site Safety Officer. The Site Safety Officer is responsible for ensact as <br /> uring that the <br /> following items are adequately addressed: <br /> w� <br /> Ensure that all personnel on-site adhere to the requirements of the project <br /> safety plan. <br /> • Obtain acknowledgement, on signoff page enclosed as Attachment A, from all <br /> on-site. personnel or visitors regarding their acceptance of the project safety <br /> E i <br /> Plan requirements. <br /> • Investigate all incidents and accidents and report in writing to the Project <br /> Supervisor who will report to the Corporate Safety Officer. <br /> • Ensure that Proper <br /> personal decontamination points are available. <br /> The Project Supervisor and the Site Safety Officer have the authority to suspend work <br /> x anytime they determine that the provisions of the plan are inadequate to ensure worker <br /> safety. The Site Safety Officer shall also inform the Project Supervisor of individuals <br /> whose conduct is not consistent with the requirements of the plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.