Laserfiche WebLink
' GROUNDWATER !MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: -Di4idit A4n& 0132 ProjecjNumb§: <br /> ,3" <br /> Address: SS 1A&W, Date: .C? <br /> Well Lock Number. <br /> . Wel! Number Well <br /> ' lnte ritY Develo mentlPur a/sam ler s : Ambient tp <br /> Conditions: <br /> Pre-Purge DO (mg/L) <br /> Screened at WELL VOLUME CALCULATION <br /> Weil caeing Total Well Depth to Linear Feet Gallons Per <br /> Din }} Dro th Go ndwater G ofWC Linear Fnat 1 Well Val�me <br /> 15 0 x 0.17 • ' <br /> ' 4 _ = x 0.38 e <br /> 4.5 _ X 0.66 <br /> g - x 0.83 a <br /> x 1.5 - <br /> GR UNDWATER SURFACE INSPECTIO BAILER CHECK <br /> Floating Product(ft.) (in.); Sheen/iridescence: <br /> Odor. yo �� <br /> GROUNDWATER PURGING PURGE MMCLD— <br /> Stainless Steel Bailer, Submersible Pump; Air Diaphragm Pump; Honda Purnp; Other <br /> ' Stagnant Volume <br /> Volumes Purged Conductivity Temp. Colorrrurbidity <br /> Purged (gal.) Time pH (Nslumhos) (°C) (other) <br />•, 0i ' <br /> 0 �� ") /r 3 C Ie <br /> , + �� Recovery <br /> '. Rate: <br /> 3 f Y .73 + <br /> 4 � a <br /> ' ------- - lum <br /> 5 -`----- <br /> Slow <br /> 6 <br /> 10 <br /> ' GROUNDWATER SAMPLING <br /> Sampling Equipment: <br /> Water Level RecoverV Sample Containers <br /> Depth to GW(I;.) No. Preservation Method/pH <br /> (I) Initially IbD 1 liter(L), amber glass <br /> (P) After Purging <br /> (P-1) - 40 rnl VOR <br /> ' (S) Before = lingiv <br /> 80% Recover, Sap rel polypropylene <br /> P-S)/ P-I X 100 = o Trip Blank <br /> ( ( ) 10 Total Recovery <br /> Sample Date/Time: 0 Turbidity (NTU). <br /> Calibrate Date/Time. qJ6•C O d3A EH (MEV):_4_ <br /> ' PURGED WATER CONTAINMENT <br /> �ial drums at site: Water w _ Soil� � Water pump through treatment system �-- <br /> ' Remarks: <br /> U?1G,amoo'aharulLSUe5lfRFhCEREMED{,STIOMADMIN Si;'85URFACz GilC1U?1iW SagipliryRvrya�dx <br />