Laserfiche WebLink
i,� GROUNDWATER MONITORING WELL PURGE/SAMPLING WORK SHEET <br /> Project Name: t4 0132 Project Number: 2 O <br /> ' Address: 355 s Date: V-30-04 <br /> _ <br /> Well tock Number: <br /> ' Well Number: -Inw—W Well Integrity: 6606 <br /> Development/Purge/Sampler(s): p-t..Yrcap Ambient Conditions: <br /> Pre-Purge DO (mg/L) <br /> !' Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Peet Gallons Per <br /> Dia in. De th(ft.1 Goundwater G of GW Linear Fact 1 Well Volume al: <br /> ' e7M,ISfl,15 _ A `� <br /> X 0.38 - � <br /> 4 - = X 0.66 - <br /> 4.5 - = X 0.53 = <br /> ' 6 - = X 1.5 - <br /> { GR UNDWATER SURFACE INSPECTIO (BAILER CHECK) <br /> Floating Product(ft.) (in.): Sheen/Iridescence: E-S Odor. S <br /> GROUNDWATER PURGING PURGE M <br /> Stainless Steel Bailer, `Submersible Pump; Air Diaphragm Pump; Honda Pump; Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> ' Purged (gal.) Time pH (pslumhos) (°C) (other) <br /> 0 0 Recovery <br /> • e O ., <br /> 2 1Rate: <br /> ff O <br /> 6D 4 SSt <br /> , <br /> ' 4 Medium <br /> 5 Slow <br /> 6 <br /> 1 8 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: i PA IF <br /> Water Level RecoverV Sample Containers <br /> ' Deth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially I F.15 1 liter(L), amber glass <br /> (P) After Purging e�D.1 40 ml VOA Het. <br /> P -0.8 (P-1) = I, 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling (.( Trip Blank <br /> (P-S)1(P-1) X 100 % Total Recovery <br /> Sample Date/Time: —9-30- 01?r,A0 Turbidity (NTU): t - <br /> Calibrate Date/Time: q-36-0EH (MEV): N A <br /> PURGED WATER CONTAINMENT <br /> .Total drums at site: Water-- Soil- _ Water pump through treatment system <br /> Remarks: <br /> 11PleasanionlsharedVSUBSURFACE RERIEDIATION%ADNIIN SUBSURFACE GROUMW Sampling-Purp1doc <br />