My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012715
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0012715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:57:11 PM
Creation date
1/31/2020 2:43:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012715
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
655
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.� ``'.��'`� � �- "'Awa .z�•� � ,� � �.�� ;�� ` x��:-°�,s.�-' -; -.„�w` €L,, ��o-• <br /> W , <br /> m <br /> ,vw<"34. <br /> , <br /> _.a.-. _ v-•�..,..� :'i s .f: --.;^*�irx��,a" `-? :. ."``" -�-'� -- - �-r .- _� -_ �e� anth',3�`�e <br /> axLraction, contaminant Concentrationa, and total contaminant <br /> vapor ra,"Yod and treated will be kept onaite. The proposed coat <br /> covera a maintenance period of nix months. <br /> 3.5 TASK V - REPORT; OF INSTALLATION AND OPERATION <br /> EA will prepare a repirt for Chevron on the VETS installation and <br /> operation after ono month of operation. The report will includo <br /> fiqurss, phot-n and a detailed doacription of the VETS and the <br /> associated plumbing and construction layout. The report will <br /> Mao precant a aum.Tary of the ayGt0M'c operation for the one- <br /> month period, with detailed results of the total amounts of con- <br /> taminant vapors removed and d discussion of tho ayatom efficiency <br /> a and expected operation proceduran for the next five months. <br /> A second report will be prepared atter six months of VETS <br /> •„ operation. <br /> w <br /> i <br /> i <br /> k <br /> c52/91918/text B <br />
The URL can be used to link to this page
Your browser does not support the video tag.