Laserfiche WebLink
Rr. <br /> INS, Yi -MM"'k-- <br /> M <br /> , <br /> IIN <br /> EEO5 MOOR,MM <br /> i. ASSUMPTIONS AND LIMITATIONS <br /> Tho proposed coon Outljn6d In Chapter 5 arc baued on the following <br /> accumPtiOn5 and limitations: <br /> 0 SJCAPCD parn1t requirementa do not drastically altar <br /> the proponad system Configuration or sampling schedule <br /> or requirements. <br /> 0 Thin proposal covers VM Inatallation and operation <br /> for nix months. <br /> Maintenance Costa do not cover damage due to vandallam <br /> or nyotem failure due <br /> to conditlona beyond LLA4z control. <br /> 0 All parmita will be Icsuod In Chevron's name except <br /> those required to be obtained by the Inatellation <br /> contractor. <br /> J <br /> 0 Ito bond costo are included <br /> (none are anticipated). <br /> 0 Electrical bills will be paid directly by Chevron. <br /> ... ........ <br /> f 9 <br />