Laserfiche WebLink
R <br /> 6.0 IMPLEMENTATION SCHEDULE <br /> A post-approval implementation schedule was prepared assuming Alternative 2 is approved <br /> for execution Site-specific groundwater monitoring was not considered because it is an <br /> established task Day 0 is assumed to be the regulatory approval date The proposed sched- <br /> ule is shown below <br /> Currently, site plans are being developed and a Taco Bell Restaurant is proposed for this site <br /> Consultations with Taco Bell representatives will occur in order to avoid negotiations that <br /> may impact remedial operations and site development <br /> Proposed Schedule <br /> 1 r <br /> Task Da <br /> Complete remedial investigation off-site 120 <br /> i source search, work plan,and well installa- <br /> tion <br /> s <br /> Design,permit and construct SVE/bioventing 210 <br /> stem with air sparge <br /> l Commission and start-u remediation system - 255 <br /> ------------ <br /> �• 3201337B/CAP_AMD DOC 22 November 30, 1995 <br />