Laserfiche WebLink
' 45 E Harding Way, Stockton, California September 1, 1993 <br /> Chevron USA Products Company Page 2 <br /> On February 24, 1988, four fiberglass underground storage tanks were excavated and removed Sod <br /> samples were collected from beneath individual tanks and analyzed Only one sample, from beneath the <br /> ' used-oil tank, contained 26 ppm high-boiling-point hydrocarbons However, samples from the sod pile <br /> contained up to 490 ppm low-boiling-paint hydrocarbons, 28 ppm toluene, and 26 ppm xylenes <br /> ' On November 7-15, 1988, six boreholes were drilled, <br /> as sampled, and completed groundwater <br /> P p <br /> ' monitoring wells Soil samples collected from MW-4 (Figure 2) contained benzene concentrations up to <br /> 9 6 ppm and total petroleum hydrocarbons (TPH) concentrations up to 3,300 ppm TPH concentrations <br /> In soil samples from all other well borings were below the detection limit of 1 ppm Groundwater <br /> ' samples collected from wells MW-1 through MW-6 In November 1988 contained TPH concentrations as <br /> high as 9,300 parts per billion (ppb) and 6,800 ppb from MW-3 and MW-4 respectively <br /> 1 <br /> In January 1989, three additional underground storage tanks were removed One of the tanks, <br /> ' discovered while drilling MW-5 in November 1988, still contained product Seven soil borings were <br /> drilled and sampled on January 23 through February 7, 1989 Two of the borings were converted to <br /> groundwater monitoring wells, and the remaining five borings were converted to vadose monitoring <br /> wells Hydrocarbon impacted sods were encountered in V-3, V-4, and V-5 <br /> ' On April 24, 1989, a soil vapor extraction test on V-3, V-4, and V-5 revealed total volatile hydrocarbons <br /> (TVH) concentrations from 4,500 to 16,000 ppm Operation of a vapor extraction and treatment system <br /> ' (VETS) began on November 15, 1990 <br /> On July 16, 1991, an additional sod boring was drilled at the site in the former tank field and converted <br /> Into a groundwater monitoring well (MW-9) <br /> ' On June 29, 1993, two additional soil borings were drilled lust east of the site in EI Dorado Avenue and <br /> were converted into groundwater monitoring wells (MW-12 and MW-13) The drilling results and <br /> ' Installation of these two wells are described In this report <br /> ' 2 1 QUARTERLY GROUNDWATER MONITORING AND SAMPLING <br /> ' The groundwater beneath the site was monitored and sampled at quarterly intervals from January 1989 <br /> through July 1993, however, several of the monitoring wells went dry during the recent drought A <br /> historical summary of a monitoring and sampling data are summarized in Table 2 <br /> GROUNDWATER <br /> 3399EAR RPT TECHNOLOGY <br />