My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REPORTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
ARCHIVED REPORTS_REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:13:09 PM
Creation date
1/31/2020 3:55:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REPORTS
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> SECTION 4.0 ACTIVITIES COMPLETED DURING THE REPORTING PERIOD • <br /> • <br /> 4.2 Annual Tree Survey • <br /> The annual tree survey was completed on August 9,2011.Observations made during the <br /> annual tree survey are presented and discussed in Section 6 and photographs taken during <br /> the tree survey are presented in Appendix E. • <br /> • <br /> 4.3 Ten-year Evaluation Soil Sampling • <br /> Soil sampling was performed at the existing phytoremediation groves on July 12 and July • <br /> 13,2011,in accordance with the RAP(CH2M HILL,2000b)and the Ten-year Sampling Event • <br /> and Additional Investigation at Former Bagging Plant Work Plan (Work Plan) (CH2M HILL, <br /> 2011).Soil samples were collected from a circular area with a diameter of approximately • <br /> 35 feet from each of the five planting locations(original test grove,turnaround area,north of • <br /> the warehouse,former bagging plant, and stormwater pond).Within each circular area, • <br /> borings were advanced using a hand auger at eight locations to a total depth of 6 feet bgs. <br /> Soil samples from each boring were divided into three depth intervals: 0 to 2,2 to 4,and 4 to • <br /> 6 feet bgs.The eight samples,excluding duplicate samples,from each depth interval were • <br /> composited and submitted for analysis.Soil samples were analyzed for TKN,nitrate as <br /> nitrogen(nitrate-N),soluble ammonia/ammonium as nitrogen(via saturation paste extract), • <br /> and pH;a few samples were also analyzed for exchangeable ammonia/ammonium as • <br /> nitrogen (via KCI extraction).The relative concentrations of soluble ammonia-nitrogen and • <br /> soluble ammonium-nitrogen(ammonia/ammonium-N) were then calculated by the <br /> laboratory on the basis of the concentration of measured total soluble • <br /> ammonia/ammonium-N,pKa,and measured pH.The results of exchangeable ammonia/ • <br /> ammonium analysis generally represent the concentration of ammonium due to the pH • <br /> (near neutral to slightly acidic) of the extract and will be referred to as exchangeable <br /> ammonium throughout the text for simplicityl. • <br /> The soil sample locations were consistent with the locations of soil samples collected in 2006 • <br /> as part of the 5-year remedy evaluation.Figures 4-1 through 4-4 show the approximate • <br /> locations of the seven sample areas (1K through 7K). • <br /> Results of soil samples collected for the Ten-year Evaluation to evaluate the • <br /> phytoremediation remedy are presented in Section 5 and discussed in Section 6. <br /> • <br /> 4.4 Former Bagging Plant Soil and Groundwater Investigation • <br /> Eight soil borings were advanced in the former bagging plant on July 11,2011,in accordance <br /> with the Work Plan (CH2M HILL,2011).At each boring location,soil samples were <br /> collected from three depth intervals:0 to 2 feet bgs,2 to 4 feet bgs,and 4 to 6 feet bgs.The • <br /> 24 samples,excluding duplicate samples,were analyzed for TKN,nitrate-N,soluble • <br /> ammonia-N/ammonium-N (via saturation paste extract),pH, and exchangeable ammonium <br /> • <br /> 1 Exchangeable ammonium as reported in the text is actually extractable ammonium,which includes both • <br /> exchangeable ammonium and soluble ammonium. Because soluble ammonium levels were typically not • <br /> detected or were detected at low levels as compared to exchangeable ammonium,for simplicity,exchangeable <br /> ammonium and extractable ammonium are not differentiated in the text.The error in the assumption is somewhat • <br /> greater for area 3K where soluble ammonium levels are greater. • <br /> 4-2 RDD1112370001(CAH5003.DOCX) • <br /> rsa 11e Va D <br /> • <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.