My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 iti�� <br /> California Regional Water Quality control Board <br /> `■/ Central Valle' Region <br /> Steven T. Butler,Chnir <br /> Winston B. Hickoe _ Grnr Davis <br /> Secremn.tor Saeramentu Main Office - Gnvernnr <br /> CnPlranmenlal Intemet Address: htip:/ANANi%.smnb.a.gov/-rwgch5 'C On <br /> Prorecnon 3443 Routier Rued.Suitc A.Sacramento,California 95827-3003 <br /> Phonc(916)255-3000•FAX(916)2553015 <br /> 16 February 2000 <br /> Mr. Daniel Munzer <br /> Munco, Inc. <br /> 401 E. Ocean Blvd., Suite 501 <br /> Long Beach, CA 90802 <br /> CONDITIONAL APPROVAL OF WORK PLAN FOR UNDERGROUND STORAGE TANKS <br /> INVESTIGATION,KOPPEL STOCKTON, SAN JOAQUINCOUNTY <br /> I received the 31 January 2000 Preliminary Subsurface Investigation ff*ork Plan for Former <br /> Underground Storage Tank Area at Koppel Stock7on Terminal(work plan)prepared by Advanced <br /> GeoEnvironmental, Inc. after I mailed my 9 February 2000 letter request for groundwater and domestic <br /> well samples to evaluate the impact of the former underground fuel tanks. Below I discuss the work <br /> plan and its relation to my 9 February letter request, a copy of which is attached. <br /> The work plan proposes to advance one soil probe boring using direct push technology beneath the <br /> former underground storage tank excavation. Soil samples will be obtained at 5-foot intervals to a depth <br /> of 20 feet or until detectable petroleum hydrocarbon vapor is not present from two consecutive 5-foot <br /> intervals. Additional borings are proposed if significant hydrocarbons are present in the first boring. <br /> Proposed soil samples are to be analyzed for TPH-d by EPA Method 8015M, and benzene, toluene, ethyl <br /> benzene, and xylene (BTEX) and methyl tertiary butyl ether MTBE by EPA Method 8020. I also <br /> request that if MTBE is tentatively identified with EPA Method 8020, it must be confirmed by EPA <br /> Method 8260. <br /> The work plan proposes to obtain grab groundwater samples if groundwater is encountered during the <br /> soil probe borings. In my 9 February letter, I requested groundwater samples from the monitoring well <br /> nearest the former tanks (KP-3) and all domestic and production wells on the property. You do not need <br /> to obtain grab groundwater samples since I am requesting the well samples. <br /> California Environmental Protection Agency <br /> Qa Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.