My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/09/98 08:45 $`5302431654 CH2M HILL RDD 9001/008 <br /> • 0 <br /> Engineers F A X <br /> - Planners <br /> • EConanVSiS Redding Offm <br /> Scientists TEL 530-243-5886 x33 FAX 530.243.1654 <br /> Fax#: Total Pages: 8 <br /> To: See Distribution List From: Gerald Vogt <br /> Company: Date: June 3, 1998 <br /> Message: <br /> Distribution List: <br /> David Stavarek 916/255-3015 <br /> Mike Infurna 209/468-3433 <br /> CC: <br /> Miriam Barbonio/Chevron Chemical Company 925/842-3194 <br /> Steve Larson/Cargill 612/742-6678 <br /> Sheldon Nelson/Chevron Research and Technology 925/842-3030 <br /> Dan Munzer/Munco 562/491-0914 <br /> Ken Laconde/SCS 562/427-0805 <br /> Burnie Wilhelm/Cargill 813/671-6146 <br /> Carla Duncan/CH2M HILL 916/920-8463 <br /> Here is a copy of the monitoring well installation workplan for the installation of the replacement well for <br /> KP-1 and the three new poplar piezometers at the Koppel Stockton Terminal at the Port of Stockton. <br /> As you are aware, San Joaquin County requires approval of the workplan by the RWQCB before issuance <br /> of a well construction permit. Please review the workplan and notify CH2M HILL and Mike Infurna of San <br /> Joaquin County of the status of the review. Thank you for your cooperation. <br /> The well installation is planned for June 11 and 12, 1998. <br /> The information in this fax is confidential and proprietary and Is intended only for the individual or entity named on the cover sheet. <br /> If you are not the intended recipient, disclosure,copying,distribution or use of this information is prohibited. If you do not receive <br /> all of the pages or have received this fax in error, please notify us immediately at the above telephone number. <br />
The URL can be used to link to this page
Your browser does not support the video tag.