My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA- Environmental Protectio•ency •__ __ PETE WILSON, Govemor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A --`' <br /> Sacramento, CA 95827-3098 <br /> PHONE: (916)255-3000 }' <br /> FAX: (916) 255-3015 „�" <br /> 16 December 1994 <br /> Mr. Paul Sundberg <br /> WESTON <br /> 83 West March Lane, Suite 12 <br /> Stockton, CA 95207 <br /> GROUND WATER INVESTIGATION WORKPLAN, MUNCO INC., KOPPEL FACILITY <br /> Staff have reviewed your 28 October 1994 submittal on the subject site, and it is approved with the <br /> following comments: <br /> 1. The proposal to install only two monitoring wells is acceptable, however, depending on future <br /> events, it may be necessary to install one or more additional wells. Such events could be a lack <br /> of successful coordination with the neighboring sites or, as is acknowledged, the discovery of <br /> contamination in the ground water. <br /> 2. The site specific Health and Safety Plan shall be submitted to this office at least one week before <br /> work commences. <br /> 3. The proposed schedule seems realistic and is satisfactory. We recognize the unpredictability of <br /> coordinating the sampling with the other sites, and will work with all concerned to facilitate <br /> matters. <br /> If you have any questions or concerns, please telephone me at (916) 255-3103, or beginning <br /> 3 January 1995, Wendy Wyels at (916) 255-3104. <br /> CHRISTINE M. HOLM <br /> Agricultural Regulatory Unit <br /> cc: \'M/s. Diane Hinson, San Joaquin County Public Health Services, Stockton <br /> Mr. John Rapp, Sierra-Pacific Groundwater Consultants, El Dorado Hills YPICIVE9 <br /> Ms. Kelye McKinney, Kennedy/Jenks Consultants, Sacramento <br /> DEC 2 0 1994 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.