will be placed 2 to 3 feet above the sand and the remainder of the well annulus will be. <br /> filled with cement. Each well will.have a traffic-box with locking cap and lock. <br /> At least 48 hours after the wells are constructed, the depth to water will be measured <br /> -and the wells will be developed by removing groundwater until the return water is free of <br /> sediment. After the development, the water will continue to be removed until the pH, <br /> conductivity and temperature=stabilize at which time a water sample will be taken and 1 <br /> sent to the laboratory for diesel analyses. The-top of the casing will be surveyed to- <br /> elevation. - <br /> LABORATORY ANALYSES <br /> The tanks at or near this site_contain only diesel,-therefore the soil and water samples <br /> Will be tested as follows: - <br /> SOIL 'Method - Detection limits <br /> EPA 8015 Diesel 5 mg/Kg_ <br /> Water <br /> EPA 8015 Diesel 50 ug/L7 <br /> EPA.602/8260B_ BTEX -0.5/1 ug/L - <br /> REPORT <br /> When all the data is received a report-of the findings will be prepared showing the <br />' geologic and laboratory results.-Based upon the results, further recommendations will <br /> be suggested, if required. <br /> PERMITS <br /> We will obtain from the Environmental Health Department San Joaquin County a'drilling <br /> _. permit. US Alert will 6e notified at least 72 hours prior to the start of drilling. If _ ' <br /> underground utilities are in-conflict with a boring location, the well will be moved to the <br /> nearest location of the original site. <br /> Once this work plan is approved by the Environmental.Health Department San Joaquin <br /> County the following-schedule will be followed: <br /> Obtain Drilling Permit = 33 weeks- <br /> Schedule <br /> eeks Schedule Drilling - 4 weeks <br /> Drilling Wells and.Installation 1 week <br /> Develop Wells and Survey 5 weeks - <br /> Laboratory Analyses and Prepare Report 5 weeks <br />