My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003773
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
ARCHIVED REPORTS_XR0003773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:03:14 AM
Creation date
2/3/2020 9:12:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003773
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 March 1999 <br /> AGE-NC Project No 98-0448 <br /> Page 10 of 10 <br /> screen Following placement of the filter pack, a surge block will be inserted into the PVC casing <br /> and lowered then raised(surged)repeatedly for approximately 10 minutes Thereafter, the depth to <br /> the top of the filter pack will be measured and bentomte chips (annular seal) placed above the filter <br /> pack and hydrated with clean tap water The remaining annular space will be sealed with portland <br /> cement Well construction diagrams are depicted in Figures S <br /> 47 SOIL VAPOR EXTRACTION PILOT TEST <br /> Following the ground water drawdown test, an SVE pilot test will be performed in order to <br /> determine remedial feasibility Soil vapor field parameters and analytical results will facilitate the <br /> design of an SVE system and will be used to determine the number of vapor wells, the spacing of <br /> wells and the selection of an SVE system <br /> An internal combustion(IC) driven engine will be used to apply a vacuum on one of the SVE well <br /> screened intervals while the flow from other selected screened intervals are measured The duration <br /> of the SVE pilot test will be approximately 8-hours Soil vapor samples will be collected at regular <br /> intervals in Tedlar bags and analyzed for TPH-g and BTEX from a state certified laboratory Results <br /> of the SVE pilot test will be included in a Corrective Action Plan (CAP) and submitted to PHS- <br /> EHD <br /> 48 AIR SPARGING PILOT TEST <br /> For performance of an in-situ air sparging (IAS)pilot test, a compressor driven unit will be used to <br /> infect air into the subsurface via the IAS well The IAS pilot test will be operated for a period of 48- <br /> hours (2 days) Several parameters, including air sparging rate, air sparging vapor concentrations, <br /> ground water depths and dissolved oxygen will be measured at regular intervals Results of the IAS <br /> pilot test will be included in a CAP <br /> Advanced GeoEmironmentaa,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.