Laserfiche WebLink
s <br /> SIERRA LUMBER MW-1(screened 20 to 40-feet) <br /> Plot of TPH-g and Ground Water Elevation vs Time <br /> 70,000 <br /> A 5 v <br /> K a <br /> r � -7 <br /> 60,000 <br /> x -9 <br /> 50,000 ° <br /> r <br /> v ° -13 <br /> k O <br /> b % <br /> d <br /> 40,000 ° r �' .� -15 <br /> v dy 3 <br /> -17C <br /> ti �, r <br /> 30,000 <br /> f <br /> -21 <br /> 20,000 <br /> R <br /> -23 <br /> 10,000 -25 <br /> Oct-94 Dec-95 Mar-96 Jun-96 Sep-96 Jan-97 Apr-97 Jun-98 Sep-98 <br /> TPH-g(ppb) <br /> Date a' . . Ground Water Elevation(feet) <br />