Laserfiche WebLink
SIERRA LUMBER MW-2(screened 20 to 40-feet) <br /> Plot of TPH-g and Ground Water Elevation vs Time <br /> 160,000 �x a► <br /> � A <br /> d , <br /> 4 <br /> 140,000 <br /> � —11 <br /> +� -13 <br /> s y <br /> 120,000 <br /> -15 0 <br /> v „ ° d <br /> xx s W <br /> » -17 Z <br /> 100,000- <br /> 80,000-- <br /> 00,000 80,000 U <br /> � -21 <br /> 60,000 -25 <br /> Oct-94 Dec-95 Mar-96 Jun-96 Sep-96 Jan-97 Apr-97 Jun-98 <br /> TPH-g(ppb) <br /> Date . . ' Ground Water <br /> Elevation(feet) <br />