My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002799
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:47:03 PM
Creation date
2/3/2020 10:23:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002799
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Working To Restore Nature <br /> All drill cuttings will be placed on plastic sheeting, covered with same, and stored on-site <br /> pending laboratory results Water used to clean the augers after drilling each boring will be <br /> ' collected and stored in 55-gallon drums approved for hazardous liquid storage pending laboratory <br /> analysis for disposal <br /> ' <br /> The monitoring ri wells will be constructed of 4-inch inside diameter PVC well screen/casing The <br /> ' wells will be completed as shown on Figure 4 The well screen will be a 0 010-inch slot and <br /> #2 mesh silica sand will be used for the filter pack Cement/sand slurry will be used to seal the <br /> ' well, in accordance with California Water Well Standards (December 1981) To protect the <br /> integrity of the well a locking, water-tight well plug will be installed on the well and a water- <br /> tight, locking weIlbox labeled "monitoring well" will be concreted over the well The wells will <br /> be developed in accordance with the accepted industry standards <br /> After installation, the wellheads will be surveyed vertically and horizontally to a common datum <br /> and tied to the existing wells Depth-to-water readings will be utilized to calculate the <br /> groundwater flow direction beneath the project site <br /> After the monitoring wells are installed the wells will be monitored for free product Water <br /> ' samples will be collected with a teflon bailer after purging a minimum of three well and filter <br /> pack volumes Samples will be collected in glass containers, preserved, sealed, labeled and <br /> ' transported on ice in an air tight cooler The samples will be analyzed by a State-certified <br /> laboratory for BTEX (EPA method 8020) and TPHg (EPA method 5030/8015) <br /> 1 <br /> 1500411REPOIRTS1WF0594 M 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.