Laserfiche WebLink
1 <br /> RESNA Industr," Inc <br /> Quality AssurancclQuabty Control Plan <br /> Rcvtsed Novcmbcr 1992 <br /> 1 Soil samples will be collected at 5-foot intervals, at significant changes in iithology and <br /> ' intervals of obvious contamination in order to develop a complete profile of soil <br /> contamination. <br /> 11.2 Sample Collection During Tank Removal <br /> Soil samples will be collected as soon as possible after removal of the tank. Where <br /> feasible, all preparations for soil sampling will be made prior to tank removal. Soil <br /> ' samples collected from a backhoe bucket or directly from the excavation floor will be <br /> collected in a thin-walled stainless steel or brass cylinder at least 3-inches long by 1-inch <br /> in diameter. From 3 to 24-inches of soil will be removed from the immediate surface <br /> area where the sample is to be taken and the cylinder will then be pounded into the soil <br /> ' with a wooden mallet, bulk density driver, or other decontaminated driving device. No <br /> headspace will be present in the cylinder once the sample is collected. Care will be <br /> taken to avoid contamination of both the inside and outside of the cylinder as well as its <br /> r <br /> contents. During sampling, latex gloves will be worn to prevent cross-contamination <br /> ' with other samples. One pair of disposable gloves will be dedicated to each sample <br /> collected. <br /> Once the sample is collected, each end of the cylinder will be sealed with aluminum foil <br /> ' or teflon tape and then capped with a polyethylene lid, taped, and labeled. The sample <br /> will then be individually sealed in a ziplock bag and immediately placed in an ice chest <br /> containing dry ice or frozen chemical ice for delivery to a state certified laboratory. <br /> Sample identification, storage and transportation will be conducted as outlined in the <br /> 1 previous section <br /> QAQCIM FUL l l <br /> 1 <br />