My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002814
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:46:31 PM
Creation date
2/3/2020 10:29:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002814
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 SCOPE OF WORK <br /> Given that only the two deep vapor extraction wells (VW-1 and VW-2) are screened across the <br /> current groundwater table elevation and that both VW-1 and VW-2 contain detectable <br /> concentrations of TPH-as-gasoline, benzene and MTBE, two additional monitoring wells are <br /> proposed to evlauate the downgradient extent of impacted groundwater and re-establish <br /> groundwater monitoring capabilities at the site <br /> To achieve these protect objectives, a scope of work consisting of the following four tasks is <br /> proposed <br /> 1 Planning and Permitting <br /> 2 Groundwater Monitoring Well Installation <br /> 3 Quarterly Groundwater Monitoring, Sampling and Analysis <br /> 4 Project Reporting <br /> A discussion of these tasks and component subtasks follows <br /> 2.1 Planningand Permittin <br /> 9 <br /> The planning and permitting task consists of preparing a site-specific health and safety plan and <br /> acquiring a monitoring well permit <br /> 2 1 1 Health and Safety Plan <br /> Prior to initiating fieldwork, a site-specific health and safety plan will be prepared in accordance <br /> with 29 CFR 1910 120 The health and safety plan will include safety procedures, chemical <br /> 1 hazard information, site safety officers, and preferred medical emergency locations <br /> 212 Permits <br /> Upon regulatory approval of this Work Plan and prior to initiating field work, a well permit will be <br /> obtained from PHSIEHD Since all of the drilling activities will be conducted on the subject <br /> property, neither an encroachment permit nor private property access agreements will be <br /> required At least 48 hours prior to drilling, PHSIEHD and Underground Service Alert (USA)will <br /> be notified so that regulatory and utility clearance inspections can be scheduled <br /> I4 <br /> k'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.