My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002814
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:46:31 PM
Creation date
2/3/2020 10:29:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002814
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 SCHEDULE <br /> Upon approval of this Work Plan, the proposed planning, monitoring well installation, <br /> development, surveying, sampling, laboratory analysis and project reporting tasks can be <br /> ' completed in approximately eight (8) weeks At the end of this time, the completion of three <br /> additional quarters of groundwater sampling will be completed in approximately 9 months The <br /> duration for each of the four tasks are as follows <br /> Task 1 Planning and Permitting 2 Weeks <br /> Task 2 Groundwater Monitoring Well Installation 3 Weeks <br /> ' Task 3 Quarterly Groundwater Monitoring (3 Quarters) 9 Months <br /> Task 4 Project Reporting (Monitoring Well Installation Report) 3 Weeks <br /> 1 <br /> r <br /> ' 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.