My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002814
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:46:31 PM
Creation date
2/3/2020 10:29:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002814
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
disposable bailers and laboratory-supplied containers Each sample container will be labeled, <br /> packaged in an iced cooler and transported under chain-of-custody manifest to a state of <br /> California-certified laboratory for analysis <br /> All groundwater samples will be analyzed for TPH-as-gasoline by Modified EPA Method 8015 <br /> and for benzene, toluene, ethylbenzene, xylenes (BTEX) and MTBE by EPA Method 8020 All <br /> laboratory analyses will be performed on a standard turn-around of five to seven working days <br /> 24 Project Reporting <br /> Project reports will be prepared and stamped by a state of California Registered Geologist <br /> Copies will be submitted to PHSIEHD, Central Valley Regional Water Quality Control Board <br /> (RWQCB), USTCF and San Joaquin Catholic Cemetery <br /> 1 <br /> 2 4 1 Problem Assessment Report <br /> The methods and findings associated with the monitoring well installation will be reported in a <br /> Problem Assessment Report (PAR) The PAR will be prepared to accordance with the Tn- <br /> Regional Board Staff Recommendations for Preliminary Investigation of Underground Tank <br /> Sites, Appendix A <br /> Ramage Environmental will utilize the results of the PAR to develop a Corrective Action Plan <br /> (CAP) The CAP will be combined with a remediation system design so that the active site <br /> remediation process can be initiated <br /> 2 4 2 Quarterly Groundwater Monitoring Re orts <br /> On a quarterly basis, groundwater monitoring reports will be prepared to document the results of <br /> the quarterly groundwater monitoring and sampling activities discussed in Section 2 3 of this <br /> Work Plan In addition to a standard discussion of methods and findings, the quarterly <br /> monitoring reports will include the following <br /> 1 <br /> • Groundwater surface contour map, <br /> • Isoconcentration maps depicting the lateral extent of impacted groundwater, <br /> • Tables summarizing historical analytical and groundwater elevation data, <br /> • Laboratory reports and field forms (Appendices) <br /> 7 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.