My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 12:04:40 PM
Creation date
2/3/2020 11:07:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UlI I <br /> V U <br /> • Routinely inspecting PPE and clothing to ensure that it is in good <br /> condition and is being stored and maintained properly. <br /> • Topping work on the site or changing work assignments or procedures <br /> if any operation threatens the health and safety of workers or the public. <br /> • Monitoring personnel who enter and exit the site and all controlled <br /> access points.. <br /> • Reporting any signs of fatigue, work-related stress or chemical exposures <br /> to the Project Manager and/or Health and Safety Manager. <br /> • Dismissing field personnel from the site if their actions or negligence <br /> endangers themselves, co-workers or the public and reporting the same <br /> to the Project Manager and Health and Safety Manager. <br /> • Reporting any accidents or violations of the site safety plan to the Project <br /> Manager and documenting the same in the project records. <br /> • Evaluating weather and chemical hazard information and making <br /> recommendations to the Project Manager about any modifications to <br /> work plans or personnel protection levels in order to maintain personnel <br /> safety. <br /> • Approving all field personnel working on site, taking into consideration <br /> their level of safety training, their physical capacity and their eligibility <br /> to wear the protective equipment necessary for their assigned tasks (i.e., <br /> Respirator Fit Testing Results.) <br /> • Overseeing the air monitoring procedures as they are carried out by the <br /> site personnel for compliance with all company health and safety <br /> policies. <br /> • Knowledge of emergency procedures, evacuation routes and the <br /> telephone numbers of the ambulance, local hospital, poison control <br /> center, fire and police departments. <br /> • Ensuring that all project-related personnel have signed the personnel <br /> agreement and acknowledgments form contained in this site safety plan. <br /> • Coordinating upgrading and downgrading PPE with the Project Manager, <br /> as necessary„ due to changes in exposure levels, monitoring results, y <br /> weather and other site conditions. <br /> Avalon Environmental Consultants 9627-001-6 <br /> Kashmar Singh Joes Truck Plaza <br /> s January 9,2001 5 Lathrop,California p <br />
The URL can be used to link to this page
Your browser does not support the video tag.