Laserfiche WebLink
Sand B groundwater zone. <br /> It is not known if Sand C is connected hydraulically to Sand A and B. Sand zone C } r 1 <br /> has not been investigated therefore the vertical extent of MTBE distribution is not <br /> known. However, due to the historically high concentrations of MTBE(2002) in <br /> MWO-1X and the strong evidence of migration in the B Zone, it is likely that if <br /> MTBE has reached the C Zone that off site migration is also likely. It is also likely <br /> that migration in the C Zone would follow the observed patterns.in the B Zone and be <br /> to the north/nortl west.o the former i7ST location. P,(++e-,r r. t,o + <br /> 3.0 SCOPE OF WORK <br /> The scope of work and objective for this proposed site assessment includes the <br /> installation of four groundwater monitoring well clusters (MW-12 through MW-15) and <br /> the possible installation of two additional groundwater monitoring well clusters if <br /> laboratory results indicate that the extent of the plume is not identified. The location and <br /> justification for these monitoring wells is outlined below and shown on Figure 3: <br /> o One groundwater monitoring well (MW-12) will be located adjacent to <br /> well MW-8 and MW-9 to the northeast of the USTs. The purpose of this <br /> well is to collect a sample from Sand C and to determine if this zone is <br /> impacted by MTBE. This well will be screened in Sand C only since the <br /> adjacent wells are screened in Sand A (MW-9) and Sand B (MW-8). Both <br /> Sand A and Sand B have been impacted by MTBE in this area. MW-12 i <br /> will indicate if there is any vertical migration of the contaminants in this <br /> high concentration and downgradient area. <br /> o One groundwater monitoring well cluster(MW-13)will be located <br /> northwest of MWO-IX and MW-2 in the planter alongside the eastern <br /> edge of South Harlan Road. This well cluster will be used to define the -7 _ l <br /> western edge of the groundwater plume in the vicinitysf a hi <br /> concentr- ion,area. Due to MTBE concentrations detected in nearby well <br /> MWO-1X, which is screened in Sand B, this well will be screened with dK <br /> one screen for Sands A and B (MW-13A/B) and a separate well <br /> construction to intercept Sand C (MW-13C). The results of the recent <br /> pump test conducted by SECOR indicate that Sand A and Sand B are <br /> interconnected in this area. The similar concentrations in the two sand <br /> zones confirms this assessment. For this reason, one well screen will be <br /> constructed to intercept both Sand A and Sand B. MW-13C will be <br /> installed as a separate well adjacent to MW-13A/B to prevent any <br /> potential cross contamination between the upper and lower sand zones. <br /> MW-13C will be installed to collect a sample from Sand C to determine if <br /> there is any vertical migration of contaminants below Sand B in this area. <br /> o One groundwater monitoring well (MW-14) will be located in Chandra F'T <br /> Way and approximately 150 feet northeast of existing groundwater j <br /> monitoring well MW-11. MTBE concentrations in MWO-2 and MW-11 _ s <br /> indicate that groundwater impacts have moved towards the east in Sand A. <br /> Well MW-14 will be installed as a well cluster with separate constructions <br /> Environmental Remediation Group Page 3 Site Assessment Work Plan <br /> Project No.0406 Joe's Travel Plaza <br />