Laserfiche WebLink
VP- <br /> cz� <br /> The soil borings will be sampled every five feet for soil lithology and select soil samples <br /> maybe sent to a laboratory for analysis. Two borings/monitoring wells (MW-12 and <br /> MW-14) will be continuously cored. The soil types encountered and other pertinent data <br /> will be recorded on a field log and soil will be described in accordance with the Unified <br /> Soil Classification System (USCS). ERG will conduct field screening of the soil cuttings <br /> using an Organic Vapor Analyzer(OVA) and the results will be incorporated into the <br /> boring logs. <br /> Each of the borings will be installed by a geologist and overseen by a California <br /> Registered Geologist or Professional Engineer. Wellheads will be completed using flush- <br /> mounted Christy boxes matched to the existing surface. Soil samples will be collected in <br /> brass or stainless steel sleeves, labeled, stored in a cooler with bagged ice, and <br /> transported to a California-certified environmental laboratory under chain of custody <br /> protocol for analysis. The samples will be analyzed for total petroleum hydrocarbons as <br /> gasoline (TPHg) and diesel (TPHd) benzene, toluene, ethyl benzene, xylene (BTEX), <br /> methyl-tertiary butyl ether(MTBE), and oxygenates using EPA Method 8260B. <br /> 5.1 Well Development,Purging and Sampling <br /> Twenty-four hours after well construction has occurred, well develop` me nt wilLhe <br /> conducted using a surge block for a period of 1 hour on e_ac�h weTi. Once wells have <br /> been developed,the w`e1Ts will be purged of of least three well volumes to obtain <br /> water that is representative of surrounding aquifer conditions. Temperature, pH, and <br /> conductivity measurements will be conducted before, periodically during, and after <br /> the purging process. Stabilization of these measurements shall occur prior to <br /> collection of a sample as indicated in ERG's Standard Operating Procedures <br /> (Appendix A). <br /> Groundwater samples will be collected in volatile organic analyte (VOA)vials and <br /> analyzed for total petroleum hydrocarbons as gasoline (TPHg), benzene, toluene, <br /> ethyl benzene, xylene (BTEX), methyl-tertiary butyl ether(MTBE), and oxygenates <br /> using EPA Method 8260B. <br /> 5.2 Waste Management <br /> Any soil cuttings generated during drilling activities will be placed in DOT-approved <br /> drums and labeled appropriately. The soil and water will be stored onsite for disposal <br /> pending analytical results obtained from assessment activities. <br /> 6.0 REPORTING <br /> At the completion of site activities, and after the laboratory analytical data has been <br /> received, ERG will prepare a report describing the sampling procedures, laboratory <br /> analytical data, and test findings. The report will contain recommendations, as <br /> appropriate, for additional work that might be necessary. <br /> Environmental Remediation Group Page 6 Site Assessment Work Plan <br /> Project No.0406 Joe's Travel Plaza <br />