4.0 SITE ACCESS <br /> Prior to commencing fieldwork, Environmental Remediation Group (ERG)will <br /> communicate with property owners to discuss the proposed scope of work, obtain <br /> permission and access agreements, and to address any concerns that the individuals may <br /> have regarding this additional assessment. <br /> 5.0 MONITORING WELL CONSTRUCTION <br /> ERG proposes to install four groundwater monitoring wells (MW-12 through 15) and an <br /> additional two groundwater monitoring wells (MW-16 and MW-17) if further definition <br /> of the plume is needed. All wells will be constructed of 2-inch diameter polyvinyl <br /> chloride (PVC) casing with 0.02 inch slot size and#2 Monterey Sand. Each well will be ND <br /> sealed to the surface using bentonite pellets with a 2-foot concrete cap and traffic-rated <br /> well vault. Wells will be installed using a truck-mounted drilling rig with a continuous <br /> flight, hollow-stem auger. The augers will be steam cleaned prior to drilling each boring. <br /> Well screen construction and well depth vary with each well based on its location and <br /> purpose. Well screens will not exceed 20 feet in length. The details for each well are <br /> indicated below and are shown in the attached well diagrams (Figure 4). <br /> • Well MW-12 will be installed to intercept Sand C. Sand C is located betweerL.5,4.. <br /> and 65 feet bgs.and is between 15-to 25-feet thick. The proposed screen interval <br /> for this well is 65 to 85 feet below ground surface (bgs) based on the cross <br /> sections preparey tratus Environmental, Inc. The actual screen interval and <br /> total well depth will be determined in the field based on soil lithology and well r—P, <br /> logging results. The well will be constructed of 2-inch diameter polyvinyl <br /> chloride (PVC) casing inside an 8-inch diameter borehole. <br /> • Well MW-13 will be installed as a well cluster with two separate wells (MW- c P 1 3 <br /> 13AB and MW-13C). Well MW-13A/B will be screened from approximately 5 .7 ' <br /> to 25 feet bgs to intercept Sand A and Sand B. Well MW-13C will be installed to p -. <br /> intercept Sand C with a proposed screen interval of 65 to 80 feet bgs based on the <br /> cross sections prepared by Stratus Environmental, Inc. '17re actual screen interval 5° ` <br /> and total well depth will be determined in the field based on soil lithology and L <br /> well logging results. The wells will be constructed of 2-inch diameter polyvinyl <br /> chloride (PVC) casing inside an 8-inch diameter borehole. <br /> • Wells MW-14 and MW-15 will each be completed as a well cluster with two <br /> separate wells (MW-14A, MW-14B and MW-15A, MW-1513). These wells have P ` <br /> been segregated into two separate screen intervals to avoid any possible cross <br /> contamination that could occur between the two sand layers in the event that there <br /> is no intersect between the layers in this area. Based on the cross sections <br /> prepared b Stratus Environmental, Inc., the proposed screen intervals for these <br /> wells is approximately 5 to 20 feet bgs.fo>;SandA and 35 tQ_45 feet.bg&for.SaiW <br /> B. The actual screen interval and total well depth will be determined in the field <br /> based on soil lithology and well logging results. The wells will be constructed of G,� <br /> 2-inch diameter polyvinyl chloride (PVC) casing inside an 8-inch diameter 7�ty <br /> borehole. ; <br /> Environmental Remediation Group Page 5 Site Assessment Work Plan <br /> Project No.0406 Joe's Travel Plaza <br />