My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:01:36 PM
Creation date
2/3/2020 12:24:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan For UST Removal and Over-Excavation-Tosco 76 Branded Facility No. 11195 <br /> October 22, 1998 <br /> removal, compliance sampling, over-excavation and handling of petroleum-impacted soils. The plan <br /> will be reviewed by GR field staff prior to initiating field operations at the site. <br /> .PROJECT STAFF . <br /> Mr. Hagop Kevork, a Registered Professional Engineer in the State of California (No. C55734), will <br /> provide technical oversight and review of the work. Mr. Douglas J. Lee, Project Manager, will <br /> supervise implementation of field and office operations. GR employs a staff.of geologists,,engineers,. <br /> and technicians who will assist with the project. <br /> If you have questions, please call us in Dublin at (925) 551-7555. <br /> Sincerely, Q <br /> Gettler-Ryan Inc. ,� �, KF` ''il <br /> Hao Kevork L No. C 55734 <br /> g.P * Exp_ ; <br /> Staff.Engineer 1 <br /> P.E. C55734 `Pl �Q '� <br /> MIA— � <br /> �F OF C!?��FC� <br /> Doug as . Lee <br /> Project Manager <br /> Attachments: Figure 1. Site Location Map <br /> Figure 2. Site Map <br /> GR Field Methods and Procedures <br /> Walton Engineering, Inc. Site Health and Safety Plan <br /> 140193.04-1 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.