Laserfiche WebLink
Work Plan For UST Removal and Over-Excavation-Tosco 76 Branded Facility No. 11195 <br /> October 22, 1998 <br /> removal, compliance sampling, over-excavation and handling of petroleum-impacted soils. The plan <br /> will be reviewed by GR field staff prior to initiating field operations at the site. <br /> .PROJECT STAFF . <br /> Mr. Hagop Kevork, a Registered Professional Engineer in the State of California (No. C55734), will <br /> provide technical oversight and review of the work. Mr. Douglas J. Lee, Project Manager, will <br /> supervise implementation of field and office operations. GR employs a staff.of geologists,,engineers,. <br /> and technicians who will assist with the project. <br /> If you have questions, please call us in Dublin at (925) 551-7555. <br /> Sincerely, Q <br /> Gettler-Ryan Inc. ,� �, KF` ''il <br /> Hao Kevork L No. C 55734 <br /> g.P * Exp_ ; <br /> Staff.Engineer 1 <br /> P.E. C55734 `Pl �Q '� <br /> MIA— � <br /> �F OF C!?��FC� <br /> Doug as . Lee <br /> Project Manager <br /> Attachments: Figure 1. Site Location Map <br /> Figure 2. Site Map <br /> GR Field Methods and Procedures <br /> Walton Engineering, Inc. Site Health and Safety Plan <br /> 140193.04-1 4 <br />