Laserfiche WebLink
--------------------- <br /> s Econ <br /> Mr. Mike Infurna, <br /> FRA July 15, 2005 <br /> Page 4 <br /> SCHEDULE <br /> Upon approval of this work plan addendum, SECOR is prepared to initiate the coordination <br /> of well installation activities, with field work beginning approximately three to four weeks. <br /> The SCM will be submitted six to eight weeks following the completion of field work and the <br /> receipt of the certified laboratory analytical reports. <br /> If there are any questions regarding this work plan, please call us at (916) 861-0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> 1W-,k19k <br /> QROFES8IO4V� <br /> Kristen Flesoras �k� ��,- BENjr q <br /> Associate Scientist Go J5� O� y <br /> w 58 9 '� m <br /> /- * EXP, 1213112006 <br /> Rusty Benkosky .E. srgT cjvj�- <br /> {` s <br /> Principal Engineer <br /> FOFCpa-1F� <br /> Attachments: Figure 1 - Site Map with Proposed Soil Boring Location <br /> Attachment 1 — Field and Laboratory Procedures <br /> cc: Ms. Shelby Lathrop, ConocoPhillips <br /> Mr. James Barton, RWQCB-CVR <br /> 11195 Second Addendum to 9-04 WP.doc SECOR International Incorporated <br />