My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
730
>
2900 - Site Mitigation Program
>
PR0542060
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 3:18:33 PM
Creation date
2/3/2020 1:29:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542060
PE
1635
FACILITY_ID
FA0024152
FACILITY_NAME
ISABELLA'S CATERING #4ED5145
STREET_NUMBER
730
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14723003
CURRENT_STATUS
02
SITE_LOCATION
730 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 PROPOSED APPROACH TO ADDITIONAL SITE ASSESSMENT <br /> Sampling procedures will generally conform to the requirements of the CVRWQCB, the <br /> Department of Toxic Substances Control (DTSC), the United States Environmental Protection <br /> Agency (EPA), and the State Water Resources Control Board UST cleanup fund guidelines (Tank <br /> Fund). Laboratory results will be evaluated using the SFRWQCB ESLs, EPA Regional Screening <br /> Levels (RSLs) and/or the August 2012 State Water Resources Control Board (SWRCB) Low-Threat <br /> UST Case Closure Policy. <br /> Borings MW-1, MW-2 and MW-3, will be advanced with a HSA drill rig and borings B12, B13, and <br /> B14 will be advanced with a direct-push drill rig operated by a State-licensed (C57) water well <br /> drilling contractor. Soil samples will be collected from the following depths: <br /> • Soil samples will be collected from borings MW-1, MW-2 and MW-3 at depths of 5, 10, <br /> 15, 20, 25, 30, and 35 feet bgs, and from borings B12, B13 and B14 at depths of 5, 10 and <br /> 15 feet bgs. <br /> Soil sampling activities are detailed in Section 5.3. <br /> Additional Site Assessment Work Plan <br /> Heliostockton Property <br /> 434 Dr.Martin Luther King Jr.Boulevard <br /> Stockton,California <br /> Partner Project Number SM17-191672 <br /> RWQCB Case#:392004 <br /> January 9,2018 <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.