My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011672
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
ARCHIVED REPORTS_XR0011672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:20:23 AM
Creation date
2/5/2020 8:08:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011672
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
01
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o During the time period between the initial ground breaking and the receipt <br /> of confirmation soil samples results indicating soils containing in excess of <br /> 1.0 mg/kg DBCP have been removed, air monitoring using sampling and <br /> analytical techniques appropriate to the characteristics of the fumigant(s) <br /> and their exposure limit(s) will be conducted at the perimeter of the work <br /> zone. Monitoring stations will be located at the perimeter of the work area <br /> in sufficient number consistent with the physical layout of the operations <br /> area and prevailing wind directions. At a minimum, one upwind and one <br /> down wind monitoring sites will be used. <br /> The duration of each air monitoring period shall be based on the capacity <br /> of the air sampling technology employed, the intensity of the excavation <br /> ' activities and the analytical turn around time. <br /> ' 3.2.4 Arrangements with Public Safety Agencies <br /> encies <br /> The Health and Safety Plan will require notification <br /> of local public safety <br /> agencies and medical facilities to advise them of the character and schedule of <br /> the excavation project. <br /> ' 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.