My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/r <br /> • <br /> STATE OF OALIFOFNIA <br /> —' PETE WILSON, Governor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD— = <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD. SUITE A <br /> SACRAMENTO, CA 95827-3098 <br /> PHONE: (91 <br /> 6) <br /> FAX: (91636161-56-56 866 <br /> 16 May 1991 MAY 2 2 1991 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Mr. Frank Zumstein <br /> Plant Manager <br /> Nestle Foods Corporation <br /> 230 Industrial Avenue <br /> Ripon, CA 95366 <br /> PHASE VI REPORT AND MINUTES OF THE 25 APRIL 1991 MEETING, NESTLE FOODS <br /> CORPORATION, SAN JOAQUIN COUNTY <br /> We have reviewed the Phase VI Report submitted by Camp, Dresser and McKee (CDM) <br /> on 27 February 1991 for the Nestle Foods Corporation site. On 25 April 1991, we <br /> held a meeting to discuss our review of the Phase VI Report as well as other <br /> issues. Our review of the Phase VI Report and the minutes of the meeting is <br /> enclosed. <br /> Based on our discussions during the meeting and in a subsequent telephone <br /> conversation with Ms. Sara Black of CDM, the following agreements and <br /> recommendations were made regarding the ground water contamination investigation <br /> and remediation at the site. <br /> 1 . The ground water level monitoring program for all of the wells may be <br /> reduced from monthly to quarterly. <br /> 2. The ground water level monitoring program and the water quality monitoring <br /> program should coincide. We recommend that the Nestle select the wet season <br /> or winter quarter (January) for analysis/interpretation of the data as this <br /> quarter is not transitional and may represent the most quiescent hydraulic <br /> conditions. <br /> 3. Annual sampling of all of the wells should be conducted during the winter <br /> quarter. Presently, quarterly sampling is not conducted on all of the <br /> wells. Annual sampling of all of the wells would give the most complete <br /> data base for data analysis/interpretation. <br /> 4. The wealth of ground water level measurements should be used for additional <br /> data analysis/interpretation to aid in the understanding of the dynamic <br /> hydraulic conditions at the site and in model calibration. We recommend <br /> that the following graphics be prepared: hydrographs, change maps and head <br /> difference maps. <br /> 5. Nestle will submit a final modeling report which summarizes the final model <br /> calibration and which addresses our comments and concerns in the enclosed <br /> memorandum. <br />
The URL can be used to link to this page
Your browser does not support the video tag.