My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. David Carls <br /> San Joaquin Local lth District <br /> September 2, 1988 <br /> f Page 2 <br /> 7. A description of the handling of the CAMP DRESSER & ytcKEE INC. <br /> p q purge and development water needs <br /> to be provided. <br /> The purge and development water is discharged to the sewer and aerated <br /> at the oxidation ponds. <br /> 8. A map showing the wells relative to the sewer lines needs to be <br /> provided. <br /> A map is attached. <br /> 9. A permit has not been issued for the Phase II Wells (M-SA,B; M-6A,B; • <br /> M-7A,B; M-BA,B; M-9A,B; VE-4; VE-5) . <br /> A permit for these wells was requested in a letter to Mr. Harlin Knoll <br /> dated October 16, 1987. The Health District procedure for the <br /> previous permit for wells M-lA,B; M-2A,B; M-2A,B; VE-1; VE-2; and VE-3 <br /> (permit dated January 1, 1987) was to perform a final inspection of <br /> the grout seal after placement. It was assumed that this procedure <br /> would be used for the Phase II wells. <br /> If you have any questions or comments, please give me a call. <br /> Sincerely, <br /> CAMP RESSER & Mc INC. <br /> y <br /> Kevin E. Kell <br /> Hydrogeologist <br /> cc: 1130-PM <br /> 1130.4:64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.