My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CAMP DRESSER & McKEE INC. <br /> CDM 10o Spear Street.Suite 700 <br /> environmental engineers, scientists. San Francisco.California 94105 <br /> planners, 8 management consultants 415 495-5009 <br /> September 2, 1988 <br /> Mr. David Carls <br /> San Joaquin Local Health District <br /> 1601 E. Hazelton Avenue <br /> Stockton, CA 95205 <br /> • <br /> Subject: Nestle Foods Corporation - <br /> Application for Permit to <br /> Install Seven (7) Monitoring <br /> Phase III Wells <br /> Dear Mr. Carls: <br /> Provided below are the responses to your comments on the Draft Phase II RI <br /> Report, which you verbally transmitted to Sara Slack of Camp Dresser & <br /> McKee Inc. (CDM) on August 25, 1988. <br /> 1. Need to supply an updated map showing all of the wells and borings. <br /> A map is attached. <br /> 2. Need a copy of the Groundwater Monitoring Plan dated June 9, 1986. <br /> A copy of the monitoring plan is attached. <br /> 3. Need a copy of the written authorization from the CRWQCB. <br /> A copy of a letter from the CRWQCB dated February 23, 1988 is <br /> attached. <br /> 4. The Phase II RI Report doesn't describe the soil sampling and analysis <br /> protocols. <br /> The soil samples were collected using a split spoon sampler. The <br /> samples were placed in glass jars and screened with a HNu Photoionic <br /> Vapor Analyzer. Selected samples were sent to the laboratory for <br /> analysis using EPA Method 8010. <br /> 5. Information on the water analytical method needs to be provided. <br /> All water samples are analyzed by EPA Method 601. <br /> 6. A description of the soil handling method needs to be provided. <br /> All drill cuttings are transported from the drill sites back to the <br /> Nestle Facility and spread out over an area for aeration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.