Laserfiche WebLink
Monthly Treatment System Performance Report <br /> Month: November-10 <br /> Submitted by: Nestle USA, Inc. <br /> Submittal Date: 22-Dec-10 <br /> Incident/Corrective Action Report <br /> Location Incident Corrective Action <br /> Industrial Avenue <br /> None No corrective action <br /> Treatment System <br /> Notes: <br /> The Industrial Avenue treatment system ran 100%of the time in November 2010. Short-duration shutdowns(approximately 20 to 60 minutes) may be caused by fluctuations <br /> in the supply power. These shut downs and start ups are part of the normal operation to protect the equipment from serious damage during under voltage conditions. The <br /> automatic restart includes purge, preheat and transfer-to-process operations that take approximately 20 minutes to complete. <br /> Page 4 of 4 <br />