Laserfiche WebLink
Groundwater Extraction Treatment System Report <br /> Month: December-10 <br /> Submitted by: Nestle USA, Inc. <br /> Submittal Date: 28-Jan-11 <br /> Groundwater Treatment System Down Time <br /> Industrial Avenue <br /> Time Down time <br /> Date Shutdown Start up (hr:min:sec) Comments <br /> N/A N/A N/A 0:00:00 None <br /> Total Down Time(hours) 0:00:00 <br /> •Down time 0.00% <br /> •Up time 100.00% <br /> Groundwater Treatment System Flow <br /> Time Period <br /> Number of Down Time Total Flow Avg.Flow <br /> Location Wells From To Days (days) (Gal) (gpm) <br /> EU-3 23-Nov-10 28-Dec-10 35 0.00 1,566,720 31.09 <br /> Industrial Avenue EU-4 23-Nov-10 28-Dec-10 35 0.00 1,515,772 30.07 <br /> EI-1 23-Nov-10 28-Dec-10 35 0.00 4,679,700 92.85 <br /> Page 1 of 4 <br />