amec— <br /> discrete <br /> sampling depths). The estimated cost for this investigation is approximately <br /> $1.2 million. <br /> • Pre-construction costs include engineering design and legal/permitting costs, which are <br /> assumed to be 6% and 5% of capital costs, respectively, for a total cost of <br /> approximately $3.2 million. <br /> • The well spacing for the recirculation wells is based on design analysis presented in <br /> Hyndman et al. (2000) and is assumed to be on 3-feet centers. Hyndman and <br /> collaborators used contaminant transport modeling coupled to a cost optimization <br /> algorithm to determine optimal well spacing. Closer well spacing allowed for more <br /> effective distribution of substrate and microbes, more efficient pumping, and lower <br /> O&M costs. The higher cost of more closely spaced recirculation wells was offset by <br /> lower O&M costs. The total cost for installation of the recirculation wells is estimated at <br /> approximately $13.3 million. <br /> • Delivery system costs include costs for the down-well pumps (one pump per well) and <br /> the injection modules. Each injection module is assumed to control ten (10) <br /> recirculation well pairs (20 wells total). As described above, the injection modules <br /> would consist of a small buildings/shed that would house supervisory control and data <br /> acquisition (SCADA), mixing tanks, pump controllers, flow instrumentation, and <br /> associated piping. Dividing the total number of wells (1,500) by 20 yields 75 injection <br /> modules. The cost for each injection module is estimated at $125,000 for a total of$9.4 <br /> million. The cost for each down-well pump is estimated at $3,500 for a total of$4.5 <br /> million. The total estimated cost for the delivery system which includes the injection <br /> modules, the down-well pumps, and trenching/piping is estimated to be approximately <br /> $14.5 million. <br /> • Installation of a performance monitoring transect of 7-channel CMT wells downgradient <br /> of the bio-curtain on 100 feet centers (same depth and spacing as remedial design <br /> CMT well transect) is estimated at approximately $875,000. <br /> • Supervision/Labor costs include construction management, well development, and <br /> groundwater sampling. Construction management costs are estimated at 6% of capital <br /> costs. Well development and sampling are very minor components of this task. The <br /> total cost for supervision and labor is estimated to be $1.8 million. <br /> • O&M costs include electricity costs, maintenance, and quarterly performance <br /> monitoring (approximately $303,000 per year). Total annual O&M costs are estimated <br /> to be $1.0 million per year, and the NPV for 30 years (7% discount rate) is estimated to <br /> be $12.5 million. <br /> AMEC Geomatrix, Inc. <br /> \\oad-fs1\doc_safe\9000s\9837.006\4000 REGULATORYTFS Assessment_Apx B_01 2711\Attachment B.2\Attach B-2.doc 132-10 <br />