My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011 REVISED FEASABILITY STUDY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
ARCHIVED REPORTS_2011 REVISED FEASABILITY STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 2:26:35 PM
Creation date
2/5/2020 10:37:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011 REVISED FEASABILITY STUDY
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nestle USA, Inc.—Ripon, CA January 28, 2011 <br /> 2011 Revised Feasibility Study <br /> Braida, W. and S.K. Ong. 2001. Air Sparging Effectiveness: Experimental Characterization <br /> Of Mass Transfer Zone for VOC Volatilization. J. Hazardous Materials, 87(1-3):241-258 <br /> Rutherford, K.W. and P.C. Johnson. 1996. Effects of Process Control Changes On Aquifer <br /> Oxygenation Rates During In Situ Air Sparging In Homogeneous Aquifers. Ground Water <br /> Monitoring & Remediation. Fall, 16(4):132-141. <br /> Environmental Cost Management, Inc. Water Replacement Contingency Plan, Former <br /> Nest16 USA, Inc. Facility, 230 Industrial Avenue, Ripon, California 95366. May 15, 2007. <br /> "v Environmental Cost Management, Inc . Monitoring Well Installation Work Plan for Industrial <br /> and Stockton Avenue Extraction and Treatment Former Nest16 USA, Inc. Facility, Ripon, <br /> California, June 2009. <br /> 'v Geomatrix Consultants. Initial Testing and Characterization Report, In Situ Groundwater <br /> Remediation Program, Former Nestl6 Facility, Ripon, California. April 2006. <br /> 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.