My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
950
>
2900 - Site Mitigation Program
>
PR0001152
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 3:20:35 PM
Creation date
2/5/2020 12:58:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001152
PE
2951
FACILITY_ID
FA0003995
FACILITY_NAME
MOHR-FRY RANCHES
STREET_NUMBER
950
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17728052
CURRENT_STATUS
01
SITE_LOCATION
950 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.r <br /> compacted and brought to grade. Backfilling was completed on September 14, 1995. The <br /> soil which had been placed in a temporary stockpile at Forward Landfill was subsequently <br /> disposed of in the Class II portion of that facility. <br /> r <br /> The CARs and chain-of-custody documentation for the excavation samples are included in <br /> Appendix B. Appendix C contains the soil disposal information. Table 1 summarizes the <br /> analytical results. <br /> 4.0 RESULTS AND CONCLUSIONS <br /> Soil samples collected at depths of 17.5 to 20.5 feet from borings CE-1, CE-2, and CE-4 did <br /> not contain detectable concentrations of VOCs. The soil sample collected at a depth of 4 feet <br /> too from boring CE-3, drilled in the area of the former pipeline, was reported to contain acetone <br /> (0.140 mg/kg), benzene (0.017 mg/kg), and 2-butanone (0.025 mg/kg). Based on the PRGs <br /> for residential sites, these VOC concentrations were not likely to pose an unacceptable health <br /> risk. Nevertheless, Universal-Rundle Corporation elected to excavate the soil in the vicinity of <br /> boring CE-3 and dispose of if at Forward Landfill. Soil samples collected from the base and <br /> four sidewalls of the pipeline area excavation did not contain detectable concentrations of <br /> VOCs. The excavation was subsequently backfilled with clean, imported fill which was <br /> compacted. <br /> Soil samples from recent borings indicate that the VOCs previously reported in the former tank <br /> and pipeline area are no longer detected in this area. <br /> L <br /> r <br /> V <br /> r <br /> r <br /> r <br /> r <br /> r <br /> CYPRESS <br /> Universal-Rundle Corporation Page 6 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.