Laserfiche WebLink
" `ol �! <br /> l.► 3.2 Soil Excavation and Backfilling (Phase II) <br /> As discussed below in Section 4, soil samples collected at depths of 17.5 to 20.5 feet from <br /> 6W borings CE-1, CE-2, and CE-4 did not contain detectable concentrations of VOCs. The soil <br /> sample collected at a depth of 4 feet from boring CE-3, drilled in the area of the former <br /> pipeline, was reported to contain acetone (0.140 mg/kg), benzene (0.017 mg/kg), and 2- <br /> `" butanone (0.025 mg/kg). <br /> Based on the U.S. Environmental Protection Agency's Preliminary Remediation Goals (PRGs) <br /> for residential sites (February 1, 1995), the concentrations of VOCs in the pipeline area soil <br /> were not likely to pose an unacceptable health risk.2 Nevertheless, based on discussions <br /> between Cypress and SJCPHS, Universal-Rundle Corporation elected to excavate the soil in <br /> the vicinity of boring CE-3 and dispose of if at Forward Landfill. This work was done in <br /> accordance with Cypress's August 23, 1995 Workplan for Soil Excavation and Additional Testing <br /> in Former Acetone Pipeline Area. <br /> V <br /> Figure 3 shows the approximate location of the pipeline area excavation. SEMCO excavated <br /> about 50 tons of soil in the area of boring CE-3 on September 7, 1995. The final excavation <br /> was approximately 11 feet by 10 feet by 8 feet deep. The excavated soil was placed directly <br /> into a truck and hauled to Forward Landfill, where it was stored in a temporary stockpile prior <br /> to disposal. During excavation, Cypress field screened the spoils for the presence of VOCs <br /> using a PID. VOCs were not detected above background concentrations. <br /> " After the excavation was complete, Cypress collected soil samples for chemical analysis from <br /> the base and four sidewalls of the excavation. The soil samples, which were collected in the <br /> presence of Mr. Steve Sasson, were obtained from the following depths. <br /> r <br /> • Bottom/base 8 feet bgs <br /> • North sidewall 5 feet bgs <br /> • East sidewall 4.75 feet bgs <br /> • South sidewall 5 feet bgs <br /> • West sidewall 4.5 feet bgs <br /> " <br /> Each soil sample was collected by driving a 2-inch-diameter by 6-inch-long stainless steel tube <br /> into the soil brought to the surface by the backhoe operator. The sample tubes were capped, <br /> `w labeled, sealed in plastic bags, placed in a cooler with blue ice, and taken under chain-of- <br /> custody to a State-accredited laboratory for analysis of VOCs, including acetone, by EPA <br /> Method 8240. <br /> Because VOCs were not detected in any of the samples collected from the base or sidewalIs <br /> of the excavation, SEMCO backfilled the excavation with clean, imported fill which was <br /> I.r <br /> 2 The reported concentrations of acetone, benzene, and 2-butanone were (i) 14,285, <br /> (ii) 82, and (iii) 348,000 times lower than their respective PRGs for residential sites. <br /> 6W CYPRESS <br /> Universal-Rundle Corporation Page 5 <br /> t� <br />