Laserfiche WebLink
N../ <br /> Ms. Hinson and Mr. Sasson <br /> August 23, 1995 <br /> Page 3 <br /> The results of the July 1995 soil boring program and the proposed excavation activities <br /> will be presented in a single site investigation report which will be submitted to the <br /> County. The report will document the procedures used, summarize the data, and <br /> analyze and discuss the findings. All data, including boring logs, certified laboratory <br /> reports, and chain-of-custody forms, will be included in appendices to the report. In <br /> addition, the waste profile form and Forward Landfill's certificate of disposal will be <br /> included. The report will also contain a map showing the locations of the borings and <br /> the final excavation area. <br /> SCHEDULE <br /> Excavation activities will be conducted in late August or early September. It is <br /> anticipated that excavation and sampling activities will be completed in 1 to 2 days and <br /> that laboratory results will be available within 1 week after the laboratory's receipt of the <br /> samples. A report will be submitted to the County approximately 30 days after the final <br /> laboratory data are received. <br /> Please call me if you have any questions. <br /> Sincerely, <br /> C ess Environmental <br /> Janet C. Kappm yer, G, CEG <br /> President <br /> Attachments: Figure 1 - Site Location <br /> Figure 2 - Site Plan <br /> Figure 3 - Area of Proposed Excavation <br /> Boring Logs (CE-1 through CE-4) <br /> Certified Analytical Reports (CE-1 through CE-4) <br />