Laserfiche WebLink
ARCADIS � �P�nJ D ARCADIS <br /> ' Infrastructure, environment buildingsZl)L''� 950 Glenn Drive <br /> FEB 1 7 Suite 125 <br /> Folsom <br /> EWiRONMEI\I I HLALTH California 95630 <br /> ' <br /> Mr. Brian Taylor, P.G. RMIT/SERVICES Tel 916.985 2079 <br /> Engineering Geologist Fax 916.985.2093 <br /> California Regional Water Quality Control Board w.w.arcadis-us.com <br /> ' Central Valley Region <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, California 95670 <br /> ENVIRONMENT <br /> Subject: <br /> Implementation Status Report and Response to Comments <br /> Chevron Fuel Terminal 100-1621 <br /> 22888 Kasson Road Dale <br /> Banta, California February 2, 2009 <br /> ' Contact. <br /> Dear Mr. Taylor: David M. Evans <br /> Phone'. <br /> On behalf of Chevron Environmental Management Company(Chevron),ARCADIS 816.985.2079 ext. 12 <br /> has prepared this letter to provide a status update for the implementation of <br /> corrective action at the former Keylock area associated with the Chevron Fuel email <br /> Terminal located at 22888 Kasson Road in Banta, California. In addition,this letter David.Evans <br /> also includes a response to comments 6 and 8 of the California Regional Water @arcadis-us.com <br /> ' Quality Control Board's (RWQCB) letter dated January 7, 2009. <br /> Our of <br /> 60046293.0000 <br /> Implementation Status <br /> As requested by the RWQCB construction drawings for the proposed biosparge <br /> system for the Keylock Area are included within Attachment 1. In addition, a <br /> ' schedule for the proposed installation and startup of the system is included as <br /> Attachment 2. <br /> Response to Comments <br /> Comment#6 <br /> ' The Third QMR does not present sufficient information upon which Regional <br /> Water Board staff can provide concurrence with the proposed "no-purge" <br /> ' sample study. By 2 February 2009, Chevron needs to submit a proposal with a <br /> more complete description of how the study will be conducted, including the <br /> time period for the study and a method for evaluating the results. <br /> Imagine the result <br /> \\ara dis-usbfficedata\sacramenlo-ca\envkhevron\1001621\6 deliverables\work plansbap implemenlalionbap implementation <br /> report 239910950.doe <br />