My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER_ANNUAL 2008 GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2900 - Site Mitigation Program
>
PR0519076
>
ARCHIVED REPORTS_FOURTH QUARTER_ANNUAL 2008 GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:27:08 PM
Creation date
2/5/2020 3:36:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER_ANNUAL 2008 GROUNDWATER MONITORING REPORT
RECORD_ID
PR0519076
PE
2950
FACILITY_ID
FA0014276
FACILITY_NAME
CHEVRON BULK TERMINAL 100-1621 UST
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
BANTA
Zip
95304
APN
23906019
CURRENT_STATUS
02
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ARCADIS Brian Taylor, P.G. <br /> February 2, 2009 <br /> 1 <br /> Data Evaluation <br /> The analytical results from all three passive sampling techniques will be compared <br /> using a 95% upper confidence limit(UCL[a=0.05=5%])to the analytical results <br /> from the standard sampling technique(e.g. purge 3 well volumes then sample <br /> collection)on a well by well basis. If approved by the RWQCB the evaluation will be <br /> 1 conducted during the second quarter 2009 with results and recommendations <br /> presented within the second quarter 2009 groundwater monitoring report. <br /> 1 Comment#3 <br /> By 2 February 2009, Chevron needs to submit an explanation detailing why DO <br /> 1 sampling at perimeter monitoring wells was not performed as requested by <br /> Regional Water Board staff. By 1 May 2009, Chevron must submit results of the <br /> requested DO sampling. <br /> Perimeter monitoring wells were installed during the fourth quarter 2008(October 1 <br /> and December 8, 2008),therefore, could not be sampled during the third quarter <br /> 1 2008 monitoring and sampling event. Dissolved oxygen(DO) results for perimeter <br /> wells were submitted within ARCADIS Fourth Quarter/Annual 2009 Groundwater <br /> Monitoring Report, dated January 30, 2009. <br /> 1 If you have any questions or comments regarding the contents of this letter, please <br /> contact either David Lay at 315.671.9197 or by e-mail at David.Lay@arcadis-us.com <br /> or David Evans at 916.985.2079 ext. 12 or by e-mail at David.Evans@arcadis- <br /> us.com. <br /> Sincerely, <br /> 1O c <br /> ARCADIS �---�i (� a DAVID LAY <br /> No.8545 ' <br /> 1 <br /> David . Evans David al Lay, C.P.G. 9� <br /> Senior roject Manager Principal Geologist OFCAt t <br /> 1 Enclosures: <br /> Attachment 1 Construction Drawings <br /> 1 Attachment 2 Implementation Schedule <br /> 1 <br /> 1 Page: <br /> 4/5 <br /> INrobwb�YL4amen�oGlk''M1CY£N10A11 W I fitM bFadln\WVI P W eY1M fiTPbmntlUPnNM limkrtanu9m flepon_]]9310350 Ox <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.