My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KENNEFICK
>
0
>
2900 - Site Mitigation Program
>
PR0506482
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 6:03:22 PM
Creation date
2/5/2020 4:11:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506482
PE
2950
FACILITY_ID
FA0007454
FACILITY_NAME
FOLSOM SOUTH CANAL PROJECT
STREET_NUMBER
0
STREET_NAME
KENNEFICK
STREET_TYPE
RD
City
COLLIERVILLE
Zip
94623
CURRENT_STATUS
01
SITE_LOCATION
KENNEFICK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Folsom South Canal Connection <br /> Preliminary Design, Alignment 2 <br /> Geotechnical Exploration <br /> Work Plan <br /> The work plan presented below is for a geotechnical exploration program along portions <br /> of the Alignment 2 alternative between the Folsom South Canal and the Mokelumne <br /> Aqueduct (Figures 1, and 2, Location Map). The purpose of the work is to establish <br /> geotechnical parameters for preliminary design of the Alignment 2 alternative. The work <br /> includes data review, reconnaissance geologic mapping along the alignment, and <br /> subsurface exploration which will be performed along the alignment at the locations <br /> shown on Figures 1 and 2. The location and access to each of the borings are described <br /> in Table 1, Boring Locations. We understand that sampling to determine the presence of <br /> hazardous materials will be included as part of this program and is to be performed by <br /> OCC under the immediate direction of CH2M Hill. <br /> 1. Data Review. <br /> Olivia Chen Consultants (OCC)will obtain and review existing subsurface <br /> geologic/geotechnical data proximate the Alignment 2 alternative between Folsom <br /> South Canal and the Mokelumne Aqueduct. Such data may be available from <br /> Sacramento County and San Joaquin County Departments of Health Services <br /> (DHS) and Public Works (DPW). <br /> 2. Obtain Drilling Permit. <br /> OCC will obtain drilling permits from the San Joaquin County Department of <br /> Health Services prior to drilling. No drilling will be done until the permits are <br /> received. <br /> 3. Locate Borings and Obtain Utilities Clearance. <br /> Prior to physically locating the drill sites, OCC will visit each site with EBMUD <br /> and the landowner or landowner's representative. OCC will mark boring locations <br /> with labeled lath and flagging and/or white paint, as suitable,upon receipt of <br /> clearance from the District's right-of-entry staff. <br /> An underground utilities surveyor, e.g. USA, will be engaged to identify the <br /> location of utilities at each of the proposed boring locations. <br /> 4. Drilling. <br /> Drilling comprises the subsurface exploration for this study and will commence <br /> within two weeks of notification of receipt of right-of-entry, contingent on weather, <br /> suitability of access roads, and availability of drilling equipment. The work will <br /> comprise of twenty-four* (24) rotary-wash borings. Seventeen(17) borings will be <br /> GAPROJECCTMEBMUD\1113\1113.21\SJC_PRM2.DOC 1 Olivia Chen Consultants, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.