My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KENNEFICK
>
0
>
2900 - Site Mitigation Program
>
PR0506482
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 6:03:22 PM
Creation date
2/5/2020 4:11:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506482
PE
2950
FACILITY_ID
FA0007454
FACILITY_NAME
FOLSOM SOUTH CANAL PROJECT
STREET_NUMBER
0
STREET_NAME
KENNEFICK
STREET_TYPE
RD
City
COLLIERVILLE
Zip
94623
CURRENT_STATUS
01
SITE_LOCATION
KENNEFICK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drilled to a depth of about 30 feet. Seven borings will be drilled to depths of 50 to <br /> 60 feet: four borings on the KRC property and three borings at the Mokelumne <br /> River crossing. Borings may be deepened if, in the judgment of the project <br /> geologist/engineer, suitable foundation has not been encountered. Borings at the <br /> Mokelumne River crossing will penetrate about 25 feet into Mehrten Formation. <br /> Borings on the KRC property will be used to provide a materials assessment <br /> beneath the proposed pipeline. <br /> A bentonite-based drill fluid will be circulated through the boring to remove drill <br /> cuttings and to stabilize the hole. A boring log will be compiled by the field <br /> geologist/engineer as the boring is advanced. Pitcher Drilling Co. of East Palo Alto <br /> will perform the work under contract to CH2M Hill. <br /> 5. Sampling. <br /> Standard Penetration Tests (SPT) will be performed at 5-foot intervals and at <br /> material changes at the discretion of OCC's field geologist/engineer. Cohesive <br /> soils will be tested with a pocket penetrometer to assess their shear strength. <br /> Sampling for corrosion testing will be coordinated with CH2M Hill staff to obtain <br /> appropriate samples at required locations and depths. <br /> A California Modified sampler may be used if a larger sample or unit weight <br /> determination is required is required. Pitcher barrel sampling is not planned but <br /> could be requested under certain circumstances, e.g. to obtain undisturbed samples <br /> in weakly cemented or indurated soils. <br /> OCC will deliver soil samples to Cooper Testing Labs of Mountain View for <br /> geotechnical testing. Corrosion samples will be retained by CH2M Hill for delivery <br /> to a laboratory of their choice. <br /> 6. Geotechnical Testing. <br /> We will select one or two soil samples per boring for grain size distribution tests. <br /> Atterberg limits tests will be performed on selected fine-grained soil samples. The <br /> grain size distribution will be used to evaluate soils for potential use as pipe bedding <br /> or other backfill. <br /> 7. Piezometers. <br /> Eight borings will be completed as piezometers to monitor water levels: 2-10; 2-11; <br /> 2-16; 2-18; 2-23; and 2-25. Boring locations are described in Table 1. Piezometers <br /> will consist of a short length(2 to 5 feet) of slotted, 1-inch-diameter, schedule 40 <br /> PVC pipe wrapped with filter fabric. The slotted section will be placed in the zone <br /> selected for monitoring by the field geologist. Blank pipe will be placed to the <br /> surface. Sand will be placed in the annulus from 1-foot below to 1-foot above the <br /> slotted section of pipe. Bentonite pellets will be placed in the bottom of the hole if <br /> the bottom of the pipe is more than 1-foot above the bottom of the hole. One-foot of <br /> G1PROJECTS\EBMUD\1113\1113.2PSJC_PRM2.DOC 2 Olivia Chen Consultants, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.