My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
6787
>
3000 – Underground Injection Control Program
>
PR0518315
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:42:51 PM
Creation date
2/5/2020 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
RECORD_ID
PR0518315
PE
3030
FACILITY_ID
FA0013829
FACILITY_NAME
KOOYMAN DAIRY/ LAB CLEAN UP
STREET_NUMBER
6787
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
6787 E JAHANT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> 1-04 <br /> t ` <br /> GROUND ZERO ANALYSIS, INC. Quality Control/Quality Assurance plan <br /> evidence. Where several types of analysis will be performed for a given well, individual samples <br /> will be collected in the following order: <br /> 1. Volatile organics <br /> 2. Purgeable organic hydrocarbons <br /> 3. Purgeable organic halogens <br /> 4. Total organic hydrocarbons <br /> 5. Total organic halogens <br /> 6. Extractable organics <br /> 7. Total metals <br /> S. Dissolved metals <br /> 9. Phenols <br /> 10. Cyanide <br /> The specific analytical methods to be utilized for the common volatilelsemivolatile analyses are <br /> shown on Table 2. <br /> Groundwater samples will be collected with a Teflon bailer with bottom emptying device. <br /> Duplicate samples will be transferred to vials or containers that meet Regulatory Agency <br /> specifications (Table 1). Groundwater from the bailer will be transferred to the sample container <br /> by allowing the fluid to flow slowly along the sides of the vessel. All containers will be filled <br /> above the top of the opening to form a positive meniscus. No head space should be present in the <br /> sample container once it is sealed. After the vial is capped it will be inverted to check for air <br /> bubbles. If bubbles are present the sample will be discarded and replaced. If it is not possible to <br /> collect a sample without head space, the problem will be noted on the field technician's sampling <br /> log. <br /> Immediately following sample collection, samples will be labeled and stored in an ice chest <br /> containing frozen chemical ice sealed in plastic bags. Sample labels will contain the following <br /> information: date, time, project ID, sample ID, and name of sampler and type of analysis. All <br /> samples will be transported under chain of custody protocol to a state certified laboratory within 24 <br /> hours. A sample container filled in the laboratory with organic free water and carried unopened <br /> during the sampling trip will also be provided (Trip Blank). A "high-low" temperature recording <br /> thermometer will accompany sample shipments to ensure proper sample temperature maintenance. <br /> Samples will be transported either by GZA personnel or by private courier. Analytical holding <br /> times will be considered in determining sampling and shipping schedules. Friday <br /> shipment/Saturday laboratory receipt of samples will be coordinated in advance with the laboratory. <br /> G ADala\GR0UNDZDIQAQCIQAQC.doc <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.