My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
6787
>
3000 – Underground Injection Control Program
>
PR0518315
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:42:51 PM
Creation date
2/5/2020 4:22:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
RECORD_ID
PR0518315
PE
3030
FACILITY_ID
FA0013829
FACILITY_NAME
KOOYMAN DAIRY/ LAB CLEAN UP
STREET_NUMBER
6787
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
6787 E JAHANT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND ZERO ANALYSIS, INC. Quality Control/Quality Assurance Plan <br /> TABLE 1 <br /> SAMPLE CONTAINERS, HOLDING TIMES & PRESERVATION <br /> .......... <br /> PAAAMt.tt ::7MAT <br /> . ................. <br /> . ............... ....................... <br /> Total Petroleum Soil 3" stainless steel or brass cylinder 14 days' 4-C <br /> Hydrocarbons 40 days2 <br /> (Light Fractions) Water 40 ml glass vial,Teflon-faced silicon septum 14 days' 4oC HCI to pH =2 <br /> 20 days' <br /> (Heavy Fractions) Water 1 amber bottles, Teflon seat/silicon septum 14 days' 4-C <br /> 40 days' <br /> Benzene Soil 3" stainless steel or brass cylinder 14 days' 4-C <br /> Toluene <br /> Xylenes Water 40 ml glass vial.Teflon seallsilicon 7 days' 4-C HCl to pH = 2 <br /> Ethylbenzene 14 days' <br /> Purgeable Soil 3" stainless steel or brass cylinder 14 days' 4-C <br /> Halocarbons <br /> Water 500 ml glass vial, Teflon seal/silicon septum 14 days' 4-C <br /> Organic Soil 3" stainless steel or brass cylinder 14 days' 4-C <br /> Lead <br /> Water 40 ml glass vial, Teflon seal/silicon septum 14 days' 4-C <br /> Ethylene Soil 3" stainless steel or brass cylinder 14 days2 4-C <br /> Dibromide <br /> 40 ml glass vial, Teflon faced silicon septum <br /> Water 14 days' 4-C <br /> Polynuclear Soil 8 oz. wide mouth glass with Teflon seal 14 days' 4,C <br /> Aromatic 40 days' <br /> Hydrocarbons Water 1000 ml amber glass with Teflon seal 7 days' 4-C <br /> 40 days' <br /> Poly-Chlorinated Soil 8 oz, wide mouth glass with Teflon seal 7 days' 4-C <br /> Biphenyls 40 days2 <br /> Water 1000 ml amber glass with Teflon seal 7 days' 4-C <br /> 40 days2 <br /> Total Metals Soil 3" stainless steel, or brass cylinder 6 months <br /> Water 1000 ml plastic 6 months pH<2 <br /> Dissolved Metals Water 1000 ml plastic 6 months pH2, 0.45 Micron Filtration <br /> Pesticides Soil 3" stainless steel, or brass cylinder 14 days2 4-C <br /> Water 1000 ml glass 7 days2 4-C <br /> NOTES; <br /> Maximum holding time for sample(extract within this time or analyze if extraction is not required). <br /> Maximum hoWng time for extract(analyze within this time). <br /> Maximum holding time for sample when pH adjusted with HCi. <br />
The URL can be used to link to this page
Your browser does not support the video tag.