My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
4505
>
2900 - Site Mitigation Program
>
PR0523363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:22:27 PM
Creation date
2/5/2020 4:29:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523363
PE
2965
FACILITY_ID
FA0015787
FACILITY_NAME
SIERRA HILLS PACKING
STREET_NUMBER
4505
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08917052
CURRENT_STATUS
01
SITE_LOCATION
4505 4799 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • 1 GEOTECHNICAL <br /> NEIL O. ANDERSON ENVIRONMENTAL <br /> A N D A S S O C I A T E S INSPECTIONS s TESTING <br /> LABORATORY SERVICES <br /> 2005MAR _9 PH 12: 11 POOL ENGINEERING <br /> POST TENSION DESIGN <br /> SAN JOAOUIN COUNTY <br /> M gij ARTHENT <br /> Mr. Mike Inf rma <br /> San Joaquin Environmental Health Dept <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, California 95020-2708 <br /> RE: Replacement of MW-3 <br /> Chinchiolo Stemilt California, L.L.C. <br /> Dear Mr. Infurna, <br /> Per our recent telephone conversation, I have enclosed the technical documents you requested. As <br /> soon as I have approval from Tim O'Brien to install a new well and abandon MW-3,I will get a <br /> copy of his approval to you accompanied by a well abandonment permit and $60.00 fee. My goal is <br /> to try to install a new well as soon as possible, and try to coordinate the timing of that event with <br /> your schedule. <br /> Please find enclosed: <br /> (1) "Monitoring Well Installation Report"for the referenced facility. <br /> (2) A February 16th letter to Mr. Tim O'Brien requesting abandoning MW-3 and installing a <br /> new well, MW-5. <br /> (3) A February l6th letter from Mr. Tim O'Brien containing comments on our request. <br /> (4) A March 3rd letter to Mr. Tim O'Brien responding to his February 16th comments. <br /> Thank you in advance for anything you could do to help speed the well installation process along. <br /> Should you have any questions regarding this letter,please do not hesitate to call either myself or <br /> Mr. Dave Welch at 209.367.3701. <br /> Sincerely, <br /> Neil O. Anderson &Associates, Inc. <br /> 71jj j L <br /> chard Ryan <br /> Senior Geologist <br /> Attachment(s) <br /> LODI • SACRAMENTO • MODESTO <br /> ENVIRONMENTAL DIVISION 902 Industrial Way•Lodi,California 95240-209.367.3701 •FAX 209.369.4228•w .noandersonxom <br />
The URL can be used to link to this page
Your browser does not support the video tag.