Laserfiche WebLink
October 1,2004 <br /> NOA Project Number: LE03-034 <br /> ' 9.0 WELL CONSTRUCTION AND MONITORING REPORT <br /> A report will be prepared to present the well construction details and analytical test <br /> results for the four (4) monitoring wells. The report will describe the drilling <br /> activities, soil conditions encountered, first encountered ground water, <br /> ' estimated ground-water gradient computed from the four monitoring wells, and both field and <br /> laboratory test results. The report will also include the: well soil logs,construction diagrams,and <br /> laboratory test result sheets. <br /> 10.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> ' This Ground Water Quality Investigation Workplan has been prepared under the supervision and <br /> direction of the undersigned. <br /> ' Z <br /> ' Clifford Walker,Jr. <br /> R.E.A. 1-00797 <br /> Project Manager <br /> David J. Welch,M.Sc. <br /> CEG-2151, CHG-653, GP-1049 <br /> Environmental Department Manager <br /> ' 11 <br />